The distribution of many rural communities in Brazil presents a major challenge in terms of providing access to energy. The production and consumption of energy can, however, have serious consequences for the natural environment. The energy sector in Brazil has been engaged in a process of ‘learning from mistakes'. One important lesson learnt is that establishing and maintaining a high-level policy consensus is key in achieving success.
The first dam on the Lower Mekong River Mainstream, Xayaburi was notified to the Lower Mekong Countries in 2010. The public consultations took place in each country. The result favoured the construction to be postponed for 10 years to allow further study.
Qingdao city, with more than 5 million inhabitants, suffers from an acute water shortage. Its water resources are unevenly distributed, both temporally and spatially. Qingdao’s urban water system also faces an inevitable rise in energy intensity and carbon emissions.
The Upper Mur River is considered as one of the most ecologically valuable rivers of Austria due to the natural reproduction for the Danube salmon. The systematic regulation of the river began at the end of the 19th century, distributaries were cut off and large areas were drained in order to intensify agricultural land use. Restoration measures started in 1997 in the area of the Upper Mur and the “Grenzmur”. Various projects facilitated the renaturation of more than 22 km both in the upper course and the Slovenian border section of the river. A policy issue highlighted by the project is the importance to reconcile key needs for nature conservation with demands for renewable energy generation from small hydro power plants.
The Khimti 1 Hydropower Project was initiated to increase hydropower supply in Nepal. Action was taken to carry out an Environmental Impact Assessment to identify promotion of livelihood, economic enhancement and social well being of the project area communities. The project formulated an Environmental Monitoring Plan as well as environmental mitigation and monitoring programme. The key lesson to learn is the importance of assessment prior to the development of any project.
The development of hydropower in the Mekong River basin can bring great economic opportunities for Laos. However, since this basin is shared with neighbouring countries, cooperation is crucial. Action was taken and the Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin was signed to coordinate the use of these resources for economic development. For Laos, this has been crucial to their success in regards to the MDGs.