Search

Sort by: Relevance | Date
/ Case studies / English

Uruguay: Capacity building for climate disaster risk management at local level in Pantanoso watershed in Montevideo (#439)

The Pantanoso watershed in Montevideo has been identified as vulnerable to threats of intense rains and floods, posing risks to the human settlements. To combat the risks, action was taken by the local population and governmental authorities to engage in a project on Climate Related Disaster Risk Management. The key lesson is that strengthening vulnerable communities upon climate risks represents a key tool for the IWRM, since it contributes to empowering the population. 

/ English

Consensus on IWRM Implementation in Central Asia

Two back-to-back meetings on water management in Central Asia recently took place in Tashkent, Uzbekistan. GWP representatives Natalia Alexeeva and Vadim Sokolov were invited to the regional workshop “Integrated Water Resources Management in Central Asia”, where they presented the IWRM Toolbox and instruments, and gave an overview of the SDG process and the activities of GWP Central Asia and Caucasus.

/ English

Non Conventional Water Resources Programme in Cyprus

“Mission Water”, the Non Conventional Water Resources Programme in Cyprus, was initiated in 2013 by the Global Water Partnership - Mediterranean (GWP-Med), in partnership with the Coca-Cola Foundation and Lanitis Bros (Coca-Cola bottler in Cyprus). The Programme’s activities are implemented in collaboration with the Pedagogical Institute of Cyprus and the Mediterranean Information Office for Environment, Culture and Sustainable Development (MIO-ECSDE). The Programme is funded by The Coca-Cola Foundation through a two-year grant (2013-2015) of 400,000 US dollars.

/ Case studies / English

Indonesia: A watershed approach to coastal zone management in Balikpapan Bay (#85)

To improve the state of the Balikpapan Bay coastal ecosystem, a coastal zone management project was initiated. After initial project failure, action was taken for policy reform and an adaptive management approach was developed, focusing on inter-agency integration. This case illustrates the importance of active project learning and adaptive management. 

/ Case studies / English

Transboundary: Rural livelihoods and irrigation management transfer in Fergana valley of Central Asia (#362)

With the collapse of the USSR, the water sector seized to be subsidised leading to deterioration of basic infrastructure. Action was taken to partially transfer the responsibility for operation and maintenance of irrigation systems to water users. Nonetheless, this has had limited success because it has been seen as an additional cost rather than benefit. This illustrates that for this to work, the returned benefits need to be higher than the costs.