Mission for the elaboration of the detailed project document on the integrated management of aquatic invasive species in the Volta basin
Project : Reversing Ecosystem and Water Degradation in the Volta River Basin (REWarD – Volta River Basin)
Title : Mission for the elaboration of the detailed project document on the integrated management of aquatic invasive species in the Volta basin
Duration : Forty (40) Man-Days (MD) spread over a calendar period of ninety (90) days Publication Date : 18/04/2024
Closing Date : 18/05/2024