GWP Knowledge search

Sort by: Relevance | Date

Search result

Total hits: 141
/ Case studies / English

Slovakia: Development of accounts simulation for tariffs and effluent charges model in water and wastewater services (#243)

Following a decision to decentralise water and wastewater services, many questions regarding the sustainable financing of water and waste services was raised. Recognising that economic and financial conditions are critical to the effectiveness of various tariff and effluent charge reforms, a financial model (ASTEC) was devised. This case demonstrates the value of using economic instruments to support the implementation of IWRM management objectives.

/ Case studies / English

Transboundary: Five countries, one biosphere; managing the floodplain (# 442)

The European rivers Mura, Drava and Danube form a 700 km long “green belt” connecting more than 800,000 ha of highly valuable natural and cultural landscapes in five countries (Austria, Slovenia, Croatia, Hungary and Serbia). This area is a symbol of unity among the countries and is planned to become a protected Transboundary UNESCO Biosphere Reserve “Mura-Drava-Danube” (TBR MDD).

/ Case studies / English

Ukraine: Sustainable Rural Development; Demonstrating solutions for water supply, sanitation and agriculture (#361)

In Ukraine, reforms in the sector of water supply and sanitation have focused on centralising water supply and sanitation. Efforts have been made to decentralise water management, delegate to local authorities as well as increase supply in rural areas. This has been done through awareness campaigns, capacity building and innovative techniques of wastewater reuse. The key lesson learnt from this case is that IWRM principles need to be considered when planning for water infrastructure. 

/ Case studies / English

Zambia: Integrated Water Resources Management and Water Efficiency planning process (#332)

IWRM is a possible solution to Zambia’s many issues in regards to its water resources. Action has been taken to implement the Partnership for African Water Development Project, aiming to facilitate the country in preparation of IWRM. It establishes stronger regional partnerships to create effective multi-stakeholder platforms, as well as stronger ties for collaboration between various stakeholders and institutions. This case study clearly illustrates the importance of ensuring participation by key actors. 

/ Case studies / English

Japan: Tsurumi River Basin Water Master Plan (#302)

The Tsurumi River Basin, located in the suburbs of Tokyo, extends over an area of 235 km2 and a river length of 42.5km. The Tsurumi River Basin is regarded as one of the most important and representative river basins in Japan. The basin was largely developed by the rapid urbanization since the 1960s. 

/ Case studies / English

India: Social side-effects of the Upper Veda Dam Project (#308)

The Upper Veda Project involves a dam that would submerge 14 villages. Opposing the project, the affected communities took action and urged for alternative solutions. The dam was eventually constructed, but the process was characterised by conflicts between the project authorities and the communities. This case illustrates that dam projects, which directly affect the livelihoods of large numbers of people, need to have developed a well defined rehabilitation plan prior to construction. 

/ Case studies / English

Romania: The Prut Basin wide-approach for nutrient reduction and cross border cooperation (#273)

The Prut River is subjected to cross border pollution. Action was taken by the Eco-Counselling Center to initiate a project to facilitate a regional, trans-boundary approach, to enable the multi-stakeholders involvement and to ensure transparency and participation on the Draft Prut River Management Plan. This case highlights an applicable approach to improving water policy and management through stakeholder integration and cross-border cooperation.

/ Case studies / English

Jamaica: Experiences of the water utility reform (#415)

Despite high water availability in Jamaica, uneven distribution in both time and space creates local scarcity. Hence, it is problematic to distribute water adequately to all sectors, and to develop abstraction points for water treatment. To address the issues, action was taken and a Water Sector Reform was proposed, including a Water Sector Strategy and Action Plan.  From this experience, the lesson learned is the importance of coordinating activities and harmonising policies, legislation and institutions.

/ Case studies / English

The Bahamas: The IWRM Planning Process in the Bahamas (#414)

The water resources of The Bahamas are threatened by over-abstraction, misuse and pollution. In the past, water management in the Bahamas has been conducted through a single-sector approach. To address its issues, actions have been taken to move towards IWRM and a multi-sector approach. In particular, attention has been focused on improving stakeholder participation and advancing political commitment. Presently only being partially successful, IWRM implementation in Bahamas highlights that it is a long term process.