Rapid urbanisation has led to widespread settlements of floodplains, resulting in widespread vulnerability of livelihoods. Since traditional approaches are no longer sufficient, a more integrated flood management approach was realised to adapt to changing social, hydrological, and environmental conditions along the nation’s major waterways. Furthermore, the Ministry of Water Resources prepared a national flood management strategy. The crucial lesson is that the key to flood risk management is learning to live with flood risks.
The Upper Veda Project involves a dam that would submerge 14 villages. Opposing the project, the affected communities took action and urged for alternative solutions. The dam was eventually constructed, but the process was characterised by conflicts between the project authorities and the communities. This case illustrates that dam projects, which directly affect the livelihoods of large numbers of people, need to have developed a well defined rehabilitation plan prior to construction.
The city of Bhopal in Madhya Pradesh is mainly receiving its water from Upper Lake. However, in the past decades, the water quality has steadily been deteriorating. This has led the government to take action and implement an integrated lake conservation program. The case demonstrates that all the stakeholders, especially, Urban Local Bodies and the public representatives should be involved in the decision making from the very beginning of such projects.
Due to substantial population growth putting increased pressure on the water resources, their quality has started to deteriorate. This is perceived as a serious issue since water is inseparably linked with the socio, economical and cultural aspects of livelihoods. Action was taken through an integrated lake conservation programme, aiming to improve water quality. The most important lesson learnt is that awareness raising, education and stakeholder participation are essential.
Due to temporal and spatial variability of rainfalls, Sri Lanka experience local scarcity. Furthermore, most water resources are used for irrigation, and little is left for industry and domestic use. Action was taken towards policy reform but these reforms were, however, nationally desired but externally designed, leading to failure since they did not account for the Sri Lankan context. This case study thus illustrates the crucial importance of national anchoring of policies.
The management of water resources in Bangladesh involves a centralised, heavy engineering approach in order to control floods and install irrigation, however, there is now a pressing need for ensuring social justice and equity in water resource development. Recognising the role of water in poverty alleviation, action has been taken to implement a 25-year National Water Management Plan. Although this is one important step, it is evident that many issues require more work.
La Poza micro-basin is experiencing severe environmental degradation, mainly due to unsustainable deforestation practices executed to expand agricultural land. To combat the issues, action was taken to implement IWRM. Throughout the implementation, there has been a high level of community participation facilitated by extensive capacity building and training in environmental management. The primary lesson drawn from this example is the crucial importance of community participation for a successful implementation.
The water resources of The Bahamas are threatened by over-abstraction, misuse and pollution. In the past, water management in the Bahamas has been conducted through a single-sector approach. To address its issues, actions have been taken to move towards IWRM and a multi-sector approach. In particular, attention has been focused on improving stakeholder participation and advancing political commitment. Presently only being partially successful, IWRM implementation in Bahamas highlights that it is a long term process.
Despite high water availability in Jamaica, uneven distribution in both time and space creates local scarcity. Hence, it is problematic to distribute water adequately to all sectors, and to develop abstraction points for water treatment. To address the issues, action was taken and a Water Sector Reform was proposed, including a Water Sector Strategy and Action Plan. From this experience, the lesson learned is the importance of coordinating activities and harmonising policies, legislation and institutions.
Encouraged by regional developments, Mali initiated the process to implement IWRM. This was done in three stages: 1) a project team and a Steering Committee were set up to define the management and steering framework of the project, 2) a situation analysis was developed and discussed with broad stakeholder groups and 3) a provisional Action Plan was prepared. This case study illustrates the key moments and events of the process of elaboration of the IWRM.