The World Bank has conducted feasibility studies in order to offer input for the decision making process over the construction of the Rogun dam. This case study describes the impact of the World Bank feasibility report on the cooperation over transboundary water resources between Uzbekistan and Tajikistan.
The first dam on the Lower Mekong River Mainstream, Xayaburi was notified to the Lower Mekong Countries in 2010. The public consultations took place in each country. The result favoured the construction to be postponed for 10 years to allow further study.
The Drin River is a complex transboundary water system and a strategic developmental resource for its riparian states in South Eastern Europe.