Search

Sort by: Relevance | Date
/ Case studies / English

International co-operation in the Scheldt and Meuse River Basins (#28)

The Meuse and the Scheldt river basins are subjected to pollution and seasonal water shortages, as well as political clash of interests regarding maritime access.  Action was taken to solve these issues by the Belgian government. However, although an agreement was eventually made, political issues made the process complex. From this case, it is apparent that a cross-sectoral approach that looks beyond the water sector is often instrumental in developing attractive package deals.

/ Case studies / English

Transboundary: National Integrated Water Resources Management Dialogues; Experience from Central and Eastern Europe (#370)

In the River Basin District of the CEE region, the countries are cooperating to develop transboundary management, using the International River Basin Commission as a platform. The aim is to address national IWRM priorities, strengthen cooperation with major stakeholders and initiate changes in policies and legislation. This case illustrates the difficulties to balance national priorities in a transboundary context. 

/ Case studies / English

Slovakia: Ruzinov Strkovec Lake in Bratislava (#275)

The Ruzinov Strkovec Lake has been subjected to severe pollution due to contaminated by illegal sewage pipes. The Association of Industry and Nature Protection took action and initiated and organised a project to both revitalise the lake and draw the attention of local people to its flora and fauna. The key lesson learnt is how the partnership between an NGO and municipality can result in a successful revitalisation of local water resources. 

/ Case studies / English

Slovakia: Pilot testing of the Water Framework Directive in Eastern Slovakian Lowlands (#354)

Large scale projects in Slovakia caused negative effects in terms of biodiversity losses and reduced floodplain ecosystem functions. To combat this, a project “Integration of Ecosystem Management Principles and Practices into Land and water Management” of Laborec-Uh region was initiated. This case illustrates the importance of accounting for both biodiversity and economic returns when developing projects. 

/ Case studies / English

Romania: The Prut Basin wide-approach for nutrient reduction and cross border cooperation (#273)

The Prut River is subjected to cross border pollution. Action was taken by the Eco-Counselling Center to initiate a project to facilitate a regional, trans-boundary approach, to enable the multi-stakeholders involvement and to ensure transparency and participation on the Draft Prut River Management Plan. This case highlights an applicable approach to improving water policy and management through stakeholder integration and cross-border cooperation.

/ Case studies / English

Romania: Cost-effectiveness analysis for realistic river basin plans (#391)

The EU Water Framework Directive requires member states to identify and implement program of measures for reaching good water status for all water bodies by 2015. In Romania, this requires substantial investments. In response to address the pressures in the Romanian river basins, a number of measures have been identified, divided into basic measures and supplementary measures. The key lesson is the value of approaching the issue with several complimentary measures. 

/ Case studies / English

Moldova: The Decrease of Water Pollution Sources in Prut River Basin through the Promotion and Implementation of the Best Agricultural Practices (#399)

In the Danube hydrographic basin, agricultural practices continue to be the main source of water pollution. A pilot project “Best Agricultural Practices” was initiated focusing on e.g. nutrient management, conservation tillage and manure management. Awareness campaigns were initiated, training and education of farmers were emphasised. The key lesson is that these projects should be complimented by other technical and investment measures. 

/ Case studies / English

Estonia and Russia: Managing transboundary waters in the Lake Peipsi/Chudskoe basin (#16)

Lake Peipsi/Chudskoe is the largest transboundary lake in Europe. Action has been taken by riparian governments of Russia and Estonia to develop and sign an Agreement on the Protection and Sustainable Use of Transboundary Water Bodies. An intergovernmental commission was established to co-ordinate the implementation of this agreement. Co-operation over Lake Peipsi demonstrates how integrated water resource management tools can be applied to transboundary waters shared by countries in transition.

/ Case studies / English

Australia: Reducing land based marine pollution by IWRM approach (#238)

Activities such as horticulture and tourism around the Great Barrier Reef create sediment, nutrient and pesticide runoff, placing increased pressure on the ecosystem. The World Wildlife Fund has taken action, predominantly by raising awareness. The key lesson is how a carefully orchestrated campaign can convince decision-makers of the importance of integrated river basin management as a means of reducing land-based marine pollution.

/ Case studies / English

Transboundary: Adaptation to climate change in the countries of the Lower Mekong Basin (#385)

There are growing concerns about the potential effects of climate change on the socio-economic characteristics and natural resources of the Lower Mekong Basin. In response to the potential impacts of climate change, the Mekong River Commission has launched the regional Climate Change and Adaptation Initiative. Furthermore, a Vulnerability and Adaptation Assessment has been conducted. The most important lesson learnt is that it is essential to establish a regional organisation to combat climate change.