Search

Sort by: Relevance | Date
/ Case studies / English

Costa Rica: Better water allocation in the Lake Arenal Watershed (#10)

There were concerns that Lake Arenal in Northern Costa Rica was threatened due to problems of deforestation and possible premature sedimentation, leading the government to take action, resulting in successful national and local benefits in terms of energy produced and area irrigated. The most important lesson learned is the importance of consulting all parties involved before initiating the project to achieve the best result. 

/ Case studies / English

Pakistan: Indus Basin Floods; Mechanisms, Impacts, and Management (#445)

The Indus River is a major transboundary river in Asia with nine tributaries. The River is about 2,800km long, with 2,682 km in Pakistan. The Indus drainage basin covers an area of about 1,140,000 km2 stretching from Afghanistan through China, India, and Pakistan. Monsoonal rains are the most important flood-causing factor in the Indus basin, followed by the size, shape, and land-use of the catchments as well as the conveyance capacity of the corresponding streams. The monsoon rains fall from June to September, and are generally intense and widespread.

/ English

Flickr Guide (Photos)

Flickr is an online treasure trove of photographs from around the world, covering every aspect of water, that is at your disposal for use in publications and online. It is important for the regions to join the GWP group (if not already members) and contribute photos.

/ English

GWP Contributes to Peru’s Groundwater Issues

Overexploitation, contamination, and salinisation of aquifers are among the main problems Peru currently faces in groundwater management. To tackle these issues, GWP Peru, with the financial and technical support of GWP South America, held a workshop on “Groundwater: steps towards adaptive and sustainable management” at the National Water Authority’s auditorium in Lima on 9 August 2013.

/ Case studies / English

Uganda: Progress towards IWRM (#382)

Uganda is faced with water scarcity, deteriorating water quality, floods and droughts, issues which are all negatively impacting Uganda's quest for economic and social development. The situation has, however, been improving with the launch of a Water Action Plan which promotes IWRM as an integral part of its strategy. Examining this case clearly illustrates that long term sustainability aspects such are often overlooked and instead, the focus is on short term domestic provision. 

/ English

GWP-C Helps Bring Together Caribbean Organisations in Water and Wastewater to Strengthen Regional Cooperation

The Global Water Partnership-Caribbean (GWP-C) together with the United Nations Environment Programme, Caribbean Regional Coordinating Unit (UNEP-CAR/RCU) and the Global Environment Facility’s Caribbean Regional Fund for Wastewater Management (GEF CReW) were able to successfully bring together over thirty (30) regional organisations working in the areas of water and wastewater in the Caribbean on April 28th and 29th, 2014 in Barbados.

/ Case studies / English

Bulgaria: Creating a watershed council along Varbitsa river (#142)

In preparation for the new Water Law in Bulgaria, as well as the EU Water Framework Directive, the watershed council was set up as a pilot to test on-site effective and participatory approaches to river resource management in the Varbitsa River. The key lesson drawn is that participatory, open, citizen-friendly and bottom-up approaches are more efficient than top-down administrative approaches.