Search

Sort by: Relevance | Date
/ Case studies / English

India: Diversion of household sewage for improving urban lake water quality (#307)

The city of Bhopal in Madhya Pradesh is mainly receiving its water from Upper Lake. However, in the past decades, the water quality has steadily been deteriorating. This has led the government to take action and implement an integrated lake conservation program. The case demonstrates that all the stakeholders, especially, Urban Local Bodies and the public representatives should be involved in the decision making from the very beginning of such projects. 

/ Case studies / English

India: Conservation and management of Bhoj Wetlands (#329)

Due to substantial population growth putting increased pressure on the water resources, their quality has started to deteriorate. This is perceived as a serious issue since water is inseparably linked with the socio, economical and cultural aspects of livelihoods. Action was taken through an integrated lake conservation programme, aiming to improve water quality. The most important lesson learnt is that awareness raising, education and stakeholder participation are essential. 

/ Case studies / English

India: Capacity Building for Improved Water Management in Andhra Pradesh (#359)

India is currently facing huge challenges in water management, including disputes on reservoir releases, over-exploitation of groundwater resources, degradation of wet lands, salt-water intrusion in coastal regions and shortages in drinking water supply. Action was taken to initiate a pilot research project to generate and disseminate knowledge. This case study illustrates that pilot demonstrations and capacity building are a prerequisite for promoting improved water management practices to all stakeholders. 

/ Case studies / English

India: A campaign for conservation of water bodies by water user groups (#246)

The district of Tikamgarh has faced severe water scarcity. Action was thus taken to implement concrete measures to restore the water bodies in the surrounding area. Together with relevant stakeholders, the district administration initiated and implemented the project. The key lesson to draw from this case is the need for the participation by all relevant groups. 

/ Case studies / English

Pakistan: A Successful Model of the Urban Water Partnership in Karachi (#440)

Karachi was characterised by inadequate water and sanitation services and wasteful and injudicious use of water by consumers. To address these issues, the Karachi Water Partnership was formed as a platform for collective action by all concerned stakeholders to better manage water resources through IWRM. The experience illustrates that there can be great value in simply improving the existing delivery mechanisms as a compliment to the implementation of new ideas.

/ Case studies / English

Nepal: Building water infrastructure as part of Khimti I Hydropower Project (Khp-I) (#191)

The Khimti 1 Hydropower Project was initiated to increase hydropower supply in Nepal. Action was taken to carry out an Environmental Impact Assessment to identify promotion of livelihood, economic enhancement and social well being of the project area communities. The project formulated an Environmental Monitoring Plan as well as environmental mitigation and monitoring programme. The key lesson to learn is the importance of assessment prior to the development of any project. 

/ Case studies / English

Transboundary: Rural livelihoods and irrigation management transfer in Fergana valley of Central Asia (#362)

With the collapse of the USSR, the water sector seized to be subsidised leading to deterioration of basic infrastructure. Action was taken to partially transfer the responsibility for operation and maintenance of irrigation systems to water users. Nonetheless, this has had limited success because it has been seen as an additional cost rather than benefit. This illustrates that for this to work, the returned benefits need to be higher than the costs. 

/ Case studies / English

Kyrgyzstan: Program Taza Suu for improvement of rural water supply and sanitation conditions (# 360)

In Kyrgyzstan, lack of drinking water and access to sanitation is a pressing problem which reinforces social vulnerability and poverty. Financed by the Asian Development Bank and the World Bank, actions have been taken to improve access to drinking water and sanitation by the Ministry of Health. These projects had a high level of community involvement which increased the sense of ownership.

/ Case studies / English

Kazakhstan: Institutional reform in the water sector to implement the IWRM plan (#342)

In Kazakhstan, the issue is not one of scarcity but of management, a problem that can be solved through applying the principles of IWRM. The government of Kazakhstan consequently initiated a water resources management project aiming at strengthening water management organisations and by instituting the practice of IWRM. In this process, training, workshops and dialogues both within and outside the water sector are crucial. 

/ Case studies / English

Central Asia & Caucasus: Regional Review of Water Supply and Sanitation in the Countries of Central Asia and Caucasus (#395)

Desires to maximise irrigated agriculture during the Soviet era has resulted in degradation of water resources. After independence, most countries in the region adopted national policies dealing with water supply and sanitation. Furthermore, since 2002, Global Water Partnership in Caucasus and Central Asia (GWP CACENA) promotes and supports introduction of IWRM. The main lesson learnt is that an IWRM approach should include any essential infrastructure needed for development.