Search

Sort by: Relevance | Date
/ English

South Africa Water Partnership

The South African Country Water Partnership (SACWP) was first launched in 2002 at a time when the Department of Water Affairs was heavily engaging with different stakeholders for implementing its 1998 new water law. Since the launch, there have been a number of attempts to revive the CWP.

  • Between 2005 and 2008, various attempts were made to rekindle the interest in the CWP primarily in the academic sector, all of which bore little to no fruit.
  • The last push to revive the CWP was in 2009 by the then interim chair of the CWP.
    In 2012 a new promising re-launch is started. Read more on the re-establishment
/ English

Tanzania Water Partnership

The Tanzania Water Partnership (TWP) was launched in Feb 2004 as the 8th CWP in the Southern African Sub Region. After its launch, the CWP addressed the needs of the 2002 Water Policy, and deliberated on strategies that could assist the government in the implementation of the Integrated Water Resource Management (IWRM) Institutional Setup.  Read more on the background of the TWP.

/ English

GWP-WMO Flood HelpDesk Can Support Flood Response

Recent floods across Central Europe have affected thousands of people, driving them from their homes. The Elbe, the Danube, the Vltava, and other rivers have overflowed their banks after several weeks of heavy rain. The floods caused extensive damage in Austria, the Czech Republic, Germany, Hungary and Slovakia.

/ English

GWP-WMO Flood HelpDesk Can Support Flood Response

Recent floods across Central Europe have affected thousands of people, driving them from their homes. The Elbe, the Danube, the Vltava, and other rivers have overflowed their banks after several weeks of heavy rain. The floods caused extensive damage in Austria, the Czech Republic, Germany, Hungary and Slovakia.

/ English

GWP-C Trains Stakeholders in Water Financing

More than twenty (20) stakeholders in St. Lucia from Ministries of Public Utilities and Finance and other government agencies, the private sector, non-governmental organisations, water and wastewater managers, legal practitioners, among others were trained in the area of Water Financing in a workshop held in St. Lucia on May 28th and 29th, 2013 put on by the Global Water Partnership-Caribbean (GWP-C) and the National Water and Sewerage Commission (NWSC) of St. Lucia.  

/ English

Water: the Connecting Link to Climate Change Adaptation

“An integrated approach to managing and developing the world’s water resources is vital for not only driving world economies, ensuring human well-being and security from hunger, but can also serve as an essential building block for enhancing coherence on adaptation,” said Dr. Ursula Schaefer-Preuss, Chair of GWP at a side event at the Bonn climate change negotiations. “Water is the connecting link because climate impacts are largely felt through the medium of water,” she said.

/ English

WACDEP Launched in Zimbabwe

Wednesday, 10 April 2013

The Global Water Partnership Southern Africa (GWPSA) in partnership with the Ministry of Water Resources Development and Management (MWRDM), today launches the Water, Climate and Development Programme (WACDEP) for Africa in Zimbabwe. The launch, which is in the form of an Inception Workshop is being held on 10 and 11th April 2013 at the Holiday Inn, Harare, Zimbabwe

/ English

Reestablishment of SA CWP

The water sector in South Africa is dynamic and facing major challenges such as reduction in capacity of the Department of Water Affairs (DWA) to engage as extensively with stakeholders. As a result of a weak partnership base, it has been difficult to ensure the implementation of equitable and sustainable IWRM. Although a South African Country Water Partnership (SA CWP) was launched in 2002, and was active in early GWP activities such as the Framework for Action (FFA) over the years the sense of purpose for a partnership among water actors diminished as the water sector changed it’s strategic dimensions. One of the challenges that the SA CWP of the Global Water Partnership faced was defining exactly what its role in South Africa would be and how it would partner with other Water sector stakeholders to ensure that it executes its tasks and achieves success.