Search

Sort by: Relevance | Date
/ English

Your website Theme

Your website theme is colour coded (if a regional site) to match the GWP global map. These colour codes should be sued all the way thorugh the GWP website and not changed. However there is room for customisation, just so long as the overall GWP brand and feel is not lost.

/ English

The Website Platform

The website is powered by a content management system (CMS), called as EpiServer. It provides a location for simple and immediate creation and management of the global, micro and regional websites.

/ English

Studies and Documents

You will find below various documents published by GWP West Africa

/ English

OUR APPROACH

Our approach is hinged on two mutually objectives:  delivering GWP strategy in the region and responding to water and climate resilience needs and contexts at all levels in the Eastern and Greater Horn of Africa.

/ Case studies / English

Mali: Capitalizing on the process of elaboration of the Action Plan for IWRM (#345)

Encouraged by regional developments, Mali initiated the process to implement IWRM. This was done in three stages: 1) a project team and a Steering Committee were set up to define the management and steering framework of the project, 2) a situation analysis was developed and discussed with broad stakeholder groups and 3) a provisional Action Plan was prepared. This case study illustrates the key moments and events of the process of elaboration of the IWRM. 

/ Case studies / English

Central Asia & Caucasus: Regional Review of Water Supply and Sanitation in the Countries of Central Asia and Caucasus (#395)

Desires to maximise irrigated agriculture during the Soviet era has resulted in degradation of water resources. After independence, most countries in the region adopted national policies dealing with water supply and sanitation. Furthermore, since 2002, Global Water Partnership in Caucasus and Central Asia (GWP CACENA) promotes and supports introduction of IWRM. The main lesson learnt is that an IWRM approach should include any essential infrastructure needed for development.