Search

Sort by: Relevance | Date
/ English

Benin, the francophone Youth acting for water hands over White Booklet to authorities

The young parliamentarians acting through the National Youth Parliament for Water and Sanitation (PNJEA) of Benin, have organized on Thursday, October 29, 2015, in Cotonou an official ceremony to present the White Booklet to the Beninese authorities. The PNJEA also seized the opportunity to distinguish its godfathers and godmothers including the Minister of Water.

/ English

GWPSA holds Validation Workshop on the Limpopo Basin DRR Action Plan

Responding to the dramatic increase in extreme weather events and mega disasters is one of the great challenges of the Limpopo River Basin. Disaster Risk Reduction (DRR) is a top priority for the basin as it seeks to hold back the tide of rising economic and human losses through flood and droughts. To reduce risks from such disasters, GWPSA has over the past 2 years been involved in the development of a disaster risk reduction action plan for the Limpopo Basin. This Plan of Action presents a strategy for integrating disaster risk reduction into the Limpopo transboundary level operations. As part of the process to developing the plan, GWPSA held a workshop on the 5th of April, 2016, to validate the draft DRR action plan of the Limpopo Basin. 

/ English

Kenya Water Partnership Elects a New Steering Committee

On 6 June 2017, Kenya Water Partnership held an extraordinary General Assembly Meeting at Grace House Resort Hotel in Nairobi, Kenya. The meeting objective was to address governance issues, elect new office bearers and meet requirements for accreditation
/ Case studies / English

Albania and Montenegro: Creating an Integrated Water Resources Plan for the Buna / Bojana Watershed (#486)

The transboundary Buna / Bojana Watershed is shared by Albania and Montenegro, as well as a long stretch of coastal zone of the Adriatic Sea. The watershed is faced with a variety of pressures, including unsustainable agricultural methods, increased tourism, and altered hydrological regimes from hydropower generation and flood control measures. Albania and Montenegro, while similar socially and economically, differ in their administrative, legal, and institutional frameworks. Regardless, both countries have recognized the need to strengthen their cross-border cooperation through the development of an integrated water resource plan (the Plan) for the watershed.

/ English

Forecasting & Modeling Approaches for the Flood Caused

Following a period of unusual heavy monsoon precipitation that started in mid-July and continue into August 2015, Myanmar experienced the most severe flooding in decades. The rainfall is associated with the south-west Monsoon, which occurs each year, but the situation got worse after the land fall of Cyclone Komen in Bangladesh on 30th July 2015 which brought strong winds and additional heavy rain to (north) Myanmar.

/ Case studies / English

Spain: Segura River returned to its health (#478)

The Segura Basin in Spain is the driest in Europe. With 365 mm of annual rainfall, this basin has the lowest rainfall in the European Union. Nevertheless, it is also a region which exports fruit and vegetables. The Segura River is thus the main water sources for irrigation. In 1986, when Spain became a member of the European Union, the production of agriculture and canned food significantly increased. As a consequence, a rise in wastewater discharges and lack of water in the already water-stressed Segura River brought extreme deterioration of the water-related ecosystem and a strong social discontent.

/ English

WACDEP Demo projects raise hope to village communities of Tampizua 2 and Azum Sapelga in Ghana!

The village communities of Tampizua II in the Bawku Municipality and Azum Sapelga in the Binduri district of Northern Ghana are very happy with the field demonstration project being implemented in their communities. Located on the borders of the White Volta River these communities are experiencing various unfortunate situations such as floodings that are affecting their livelihoods because of climate related factors.

/ English

Mékrou Project, national studies ready on development priorities

    The first draft of the national studies in Benin, Burkina and Niger on the identification of development priorities in the Mekrou Basin have been submitted to the Project Manager. These drafts were forwarded to the Project Management team as well as to the international consultant recruited by GWPO to make a coherence in the national studies. The international consultant is to ensure the national consultants’ work comply with the Terms of Reference and create a coherence between the three studies.