The transboundary Buna / Bojana Watershed is shared by Albania and Montenegro, as well as a long stretch of coastal zone of the Adriatic Sea. The watershed is faced with a variety of pressures, including unsustainable agricultural methods, increased tourism, and altered hydrological regimes from hydropower generation and flood control measures. Albania and Montenegro, while similar socially and economically, differ in their administrative, legal, and institutional frameworks. Regardless, both countries have recognized the need to strengthen their cross-border cooperation through the development of an integrated water resource plan (the Plan) for the watershed.
The Zambezi Watercourse Commission (ZAMCOM) and its stakeholders have continued efforts to improve the management of the Zambezi River Basin. A recent activity was an inaugural stakeholder consultation in collaboration with government agencies, academia, other RBOs, and local representatives, which ZAMCOM organised in Windhoek, Namibia from 27-28 September, 2016. The consultation was held under the theme “Enhancing Transboundary Cooperation through Stakeholder Engagement in the Zambezi Basin”.
The GWP Cameroon hosted in Yaounde, the 8th WACDEP Technical Coordination meeting from the 28-30th September 2016.
Attendees to this regional meeting were the members of WACDEP Coordination Unit, regional and national WACDEP program Managers from the five Regions (GWP Med, GWP SA, GWP EA, GWP WAf and GWP CAf); the GWP-O Head of Program and the GWP-Cameroon Chair who led the GWP-CAf team.
The last technical coordination meeting held in Yaounde over three days had double main objectives. The first objective was to define the approaches for the regions and Country Water Partnerships (CWPs) to better handle the project document preparation process of WACDEP 2 and agree on the timelines of submitting the document to WACDEP Coordination Unit (WACDEP CU) for review. Therefore, two approaches were proposed with regards to the budget constraints: (a) to recruit a consultant for facilitating the process and (b) to constitute a team of experts of the WACDEP Technical Working Group (TWG) to develop the project documentation with a support from the WACDEP CU.
The second one was to agree on the roadmap for drafting the WACDEP (2011-2016) final report to submit it by 15 of October 2016.