Lake Jipe is facing a number of environmental and management problems which if not addressed, might lead to the disappearance of the lake. These problems include siltation, soil erosion, recurring droughts leading to shrinking fishery, deforestation, reduced lake run off, overgrazing and invasive waterweeds. The Lake Jipe Basin Integrated Management Plan (2009-2014) was developed in a consultation with various stakeholders including government, civil society, private sector and the local communities.
GWPSA will participate in a panel discussion and make a presentation on “Sharing of experiences on successful Water Conservation and Demand Management Programmes in other countries”. The discussion is a part of the sector policy dialogue on Water Conservation and Water Demand Management (WDM) that will be hosted by the Policy Unit under the Department of Water Services, South Africa, and will be held on Wednesday 16th March, 2016 in Pretoria.
Responding to the dramatic increase in extreme weather events and mega disasters is one of the great challenges of the Limpopo River Basin. Disaster Risk Reduction (DRR) is a top priority for the basin as it seeks to hold back the tide of rising economic and human losses through flood and droughts. To reduce risks from such disasters, GWPSA has over the past 2 years been involved in the development of a disaster risk reduction action plan for the Limpopo Basin. This Plan of Action presents a strategy for integrating disaster risk reduction into the Limpopo transboundary level operations. As part of the process to developing the plan, GWPSA held a workshop on the 5th of April, 2016, to validate the draft DRR action plan of the Limpopo Basin.
Coinciding with the meeting of the GWP Steering Committee (SC), a High Level Roundtable on Water Security and the SDGs was held in Yangon, Myanmar on May 24, 2016.