Search

Sort by: Relevance | Date
/ Case studies / English

Romania: The Prut Basin wide-approach for nutrient reduction and cross border cooperation (#273)

The Prut River is subjected to cross border pollution. Action was taken by the Eco-Counselling Center to initiate a project to facilitate a regional, trans-boundary approach, to enable the multi-stakeholders involvement and to ensure transparency and participation on the Draft Prut River Management Plan. This case highlights an applicable approach to improving water policy and management through stakeholder integration and cross-border cooperation.

/ Case studies / English

Romania: Strengthening of water users associations (#154)

After the USSR was dissolved, Romania has experienced water scarcity for agriculture. The World Bank and USAID are providing loans/funds for irrigation projects and to strengthen water users associations. This case thus illustrates that irrigation subsidies may be needed to support agriculture until farming efficiency improves and returns from the sale of agricultural products can cover costs.

/ Case studies / English

Romania: Lessons from Water Safety Plans for small-scale water supply systems as developed by schools (#427)

In Romania, water is subjected to deteriorating quality. In rural areas, 70% of the population depend on small scale water supply systems, which are often exposed to human and animal manure. To combat this, the project Safe Sanitation, Health and Dignity was initiated. This project shows that programmes could connect local communities, regional and national authorities, and contribute to the realisation of the allocated targets of the protocol of water and health.

/ Case studies / English

Romania: Cost-effectiveness analysis for realistic river basin plans (#391)

The EU Water Framework Directive requires member states to identify and implement program of measures for reaching good water status for all water bodies by 2015. In Romania, this requires substantial investments. In response to address the pressures in the Romanian river basins, a number of measures have been identified, divided into basic measures and supplementary measures. The key lesson is the value of approaching the issue with several complimentary measures. 

/ Case studies / English

Poland: NATURA 2000 implementation as an example of the IWRM process (#244)

NATURE 2000 comprises a designation of nature sites of EU importance. However, after consultations with water managers, it became clear that NATURE 2000 sites located in the river valleys imposed new challenges for water resources management. Action was taken by GWP-Poland and WWF-Poland to find solutions. The project demonstrates that multi-stakeholder dialogue is a basic requirement for the solution of problems involving different perspectives and priorities.

/ Case studies / English

Poland: Guidelines and Recommendations for the Planning Process According to the Requirements of the Water Framework Directive; The Upper Vistula River Basin (#380)

Management of the Upper Vistula basin is guided through the project Continuation of the Implementation of the Water Framework Directive, which is a joint French-Polish initiative. This project provides avenues for exchange of practical experiences between Polish and French partners, mobilises different stakeholders within basin borders. The most important lesson learned is to remember that documents should be transparent and comprehensible. 

/ Case studies / English

Moldova: Analysis of transboundary management of the Dniester river basin (#425)

Dniester river basin is a transboundary basin shared by Moldova and Ukraine. Throughout the Soviet era, the water quality deteriorated severely. After the USSR was dissolved, a bilateral agreement was signed by Moldova and Ukraine on the joint use and protection of water resources. This cooperation framework is based on the contributions of network of local authorities. This case illustrates the importance of cooperation among all key stakeholders.

/ Case studies / English

Hungary/Romania: Transboundary River Basin Management of the Körös/Crisuri River Project (#379)

Körös/Crisuri transboundary River Basin is in need of more transboundary cooperation and coordination to ensure sustainable management of the resource. To address this, Romania and Hungary jointly developed a strategy for integrated water resources management, aiming to strengthen cooperation. The key lesson is that access to, and management of data is at the core of decision-making in the case of transboundary water management. 

/ Case studies / English

Estonia and Russia: Managing transboundary waters in the Lake Peipsi/Chudskoe basin (#16)

Lake Peipsi/Chudskoe is the largest transboundary lake in Europe. Action has been taken by riparian governments of Russia and Estonia to develop and sign an Agreement on the Protection and Sustainable Use of Transboundary Water Bodies. An intergovernmental commission was established to co-ordinate the implementation of this agreement. Co-operation over Lake Peipsi demonstrates how integrated water resource management tools can be applied to transboundary waters shared by countries in transition.

/ Case studies / English

Bulgaria: Creating a watershed council along Varbitsa river (#142)

In preparation for the new Water Law in Bulgaria, as well as the EU Water Framework Directive, the watershed council was set up as a pilot to test on-site effective and participatory approaches to river resource management in the Varbitsa River. The key lesson drawn is that participatory, open, citizen-friendly and bottom-up approaches are more efficient than top-down administrative approaches.