Lake Jipe is facing a number of environmental and management problems which if not addressed, might lead to the disappearance of the lake. These problems include siltation, soil erosion, recurring droughts leading to shrinking fishery, deforestation, reduced lake run off, overgrazing and invasive waterweeds. The Lake Jipe Basin Integrated Management Plan (2009-2014) was developed in a consultation with various stakeholders including government, civil society, private sector and the local communities.
The transboundary Buna / Bojana Watershed is shared by Albania and Montenegro, as well as a long stretch of coastal zone of the Adriatic Sea. The watershed is faced with a variety of pressures, including unsustainable agricultural methods, increased tourism, and altered hydrological regimes from hydropower generation and flood control measures. Albania and Montenegro, while similar socially and economically, differ in their administrative, legal, and institutional frameworks. Regardless, both countries have recognized the need to strengthen their cross-border cooperation through the development of an integrated water resource plan (the Plan) for the watershed.
The International Water Centre (IWC) is currently offering up to three full scholarships for qualified international candidates interested in studying the Master of Integrated Water Management (MIWM) commencing in February 2017 at The University of Queensland.