Search

Sort by: Relevance | Date
/ IWRM tools / English

Legal Framework (A2)

Legal frameworks play an important role in the management of water resources at a range of scales – from local and national legislation covering domestic use, to international treaties that govern waters shared by sovereign nations.
/ IWRM tools / English

Management Instruments (C)

Management instruments are specific methods that enable decision makers to make rational and informed choices when it comes to water management and to tailor their actions to specific situations. Good water governance, according to IWRM principles brings together perspectives and knowledge from different domains. Consequently, the instruments presented here are based on a variety of disciplines such as hydrology, hydraulics, environmental sciences, system engineering, legal sciences, sociology, and economics.
/ IWRM tools / English

Institutional Arrangements (B)

It is often said that the current water crisis is mainly a crisis of governance, much more than a crisis of water shortage or water pollution per se. In the context of IWRM, governance is defined as the range of political, social, economic and administrative institutions that are in place (or need to be in place) to develop and manage water resources in sustainable manners. This section identifies four institutional roles that must be fulfilled for water governance systems to achieve sound IWRM practices: B1 – Regulation and Enforcement; B2 – Water Supply and Sanitation Services; B3 – Coordination and Facilitation; and B4 – Capacity Building.
/ Case studies / English

Transboundary: Water Governance and Implementation of IWRM through Local Community Action in the Tacaná Watersheds; Guatemala & Mexico (#424)

Wathersheds of Tacana originate on the volcano, with both shared by Guatemala and Mexico. This region is of great strategic importance for both countries since they supply water to a large number of residents in the cities located downstream and are the main source of irrigation water for agriculture. In the lower reaches, fishing is an important source of income.

/ Case studies / English

Transboundary: Oppportunities and Challenges for the Shared Management of Watersheds; the Trifino Plan for the Upper Lempa (#394)

The Lempa River is shared by Guatemala, El Salvador and Honduras, making its management a good example of transboundary cooperation. To reach consensus, action was taken to develop a treaty as part of a regional process.  However, since the treaty was not accompanied by strategies designed by local actors, it is somewhat weak. Nonetheless, this case illustrates that political willingness is crucial for advancing towards IWRM in transboundary watersheds. 

/ Case studies / English

Nicaragua: Management plan for the Cocibolca Great Lake (#325)

The San Juan River waters have experienced deterioration due to poor management of its basin. To address the issues, action has been taken to implement IWRM to address the areas of water, soil, forests and municipal development in a cross-sectoral manner.  This case study is a good reminder of the integrated nature of IWRM, and the importance of a model that accounts for management of both water and land.

/ Case studies / English

Turkey: Transfer of irrigation management to water users associations (#57)

In Turkey, operations and maintenance for irrigation systems was highly centralised, but this imposed an increasing institutional and financial burden on the government. Action has consequently been taken to transfer irrigation management to Water User Associations. The key insight from this case is that legal reforms should accompany institutional changes to enable full benefits to be gained.

/ Case studies / English

Transboundary: Prespa Basin National Park (#258)

The Prespa basin was affected by over-abstraction and diversion of water, wetland drainage, deforestation and overgrazing, leading to danger for human livelihoods and ecosystems. Action was taken by WWF through the creation of the Society for the Protection of Prespa, eventually culminating in the creation of Prespa National Park. The lesson drawn is that to change the perspective of local stakeholders to ensure that they share a common vision is vital for success.

/ Case studies / English

Morocco: Irrigation water pricing policy of large scale irrigation projects (#428)

In Marocco, rapid urbanisation has led to increased demands for quality and quantity of water resources. To meet the challenges posed by the growing water scarcity, Morocco has adopted an integrated approach to water resources management through mutually reinforcing policy and institutional reforms, including the adoption of a long term IWRM strategy. The key lesson is the importance of introducing economic incentives to water management. 

/ Case studies / English

Jordan: From water service provision to planning and management in the Jordan valley authority (#161)

In order to meet new demands, the Jordan Valley Authority was in need for reform. Action was taken to initiate a public strategic planning process led by a steering committee composed of all relevant stakeholders and various working groups. The case consequently illustrates how an integrated strategic planning process can create conditions under which all stakeholders can be involved in the proposed institutional reform.