Search

Sort by: Relevance | Date
/ English

Rwanda-Burundi to Fast-Track WACDEP Implementation

Water, Climate and Development Programme (WACDEP) implementation team from Rwanda and Burundi resolved to fast-track the implementation activities and fill existing gaps identified in the 2013. The commitment was expressed during a joint review and self-assessment meeting bringing together 21 participants in Kigali, Rwanda November, 8th 2013.

/ English

AMCOW Training Looks at German Climate Adaptation Strategy

A joint GIZ, African Union Commission (AUC) and GWP study tour covered the topic of “Water Security and Climate Resilient Development in the German Water Sector” in Berlin in June. The participants were from the African Ministers’ Council on Water (AMCOW) Technical Advisory Committee (TAC), and the training provided a closer look at effective climate adaptation measures in the German water sector.

/ English

GWPSA holds Validation Workshop on the Limpopo Basin DRR Action Plan

Responding to the dramatic increase in extreme weather events and mega disasters is one of the great challenges of the Limpopo River Basin. Disaster Risk Reduction (DRR) is a top priority for the basin as it seeks to hold back the tide of rising economic and human losses through flood and droughts. To reduce risks from such disasters, GWPSA has over the past 2 years been involved in the development of a disaster risk reduction action plan for the Limpopo Basin. This Plan of Action presents a strategy for integrating disaster risk reduction into the Limpopo transboundary level operations. As part of the process to developing the plan, GWPSA held a workshop on the 5th of April, 2016, to validate the draft DRR action plan of the Limpopo Basin. 

/ English

Strengthening Drought Knowledge

GWP Central America has been working closely with the Regional Committee for Water Resources (CRRH), which is part of the Central American Integration System, to strengthen regional capacity in the monitoring of climate to support decision making, especially related to agriculture, fisheries, water resources management, risk management and food security.

/ Case studies / English

Ethiopia: Participatory IWRM planning: Lessons from Berki Catchment (#365)

Water is a source of conflict around the Berki River Basin in Ethiopia, predominantly a consequence of a lack of IWRM awareness and an institutional framework. Action was taken to implement an IWRM pilot project to account for different stakeholder interests, resulting in the development and adoption of the Berki Basin IWRM. Key lessons drawn from the project include the importance of capacity building, consensus building, and the importance of decentralised multi-stakeholder platforms for conflict management.