Search

Sort by: Relevance | Date
/ IWRM tools / English

Planning for IWRM (C4)

In contrast to prescriptive and rather rigid master water plans, an IWRM-oriented planning process takes a more flexible and dynamic approach to planning the development and management of water resources. Planning reflects the total activity in the system, whether defined as river basin, catchment, or watershed, including for example agriculture, forestry, mining, and other land uses. IWRM plans can be used to strengthen good governance within a strategic water management framework of goals, policies, and planned actions to achieve the goals. Since participation is one of the key pillars of integrated water management, stakeholders should be involved in the planning and implementation process.
/ Case studies / English

Transboundary: Making space for water in the Bodrog River Basin (#398)

The Bodrog River Basin is exposed to severe flooding caused by jumbled urbanisation and low connectivity between land (agriculture and forestry), urban and water planning. Management is made more complex by the transboundary nature of the basin. A project was, however initiated to strengthen cooperative management and to mitigate consequences of floods through achieving consistent and holistic management of flood risk in three basin countries. This case illustrates the importance of transboundary flood management. 

/ Case studies / English

Kenya: Community management in Lake Victoria Drainage Basin (#51)

The Lake Basin Development Authority was set up to manage the entire catchment area of all rivers draining into Lake Victoria. However, its performance was not to the expectation. A further, action was taken to decentralise management and priority was given to achieve access to basic water requirements for the poor, as well as quality of water and improving availability of water for livestock and irrigation. The key lesson learnt is the importance of a participatory approach.

/ English

GWP supports NAP process in Malawi

Malawi is launching its NAP Process by holding the first ever NAP stakeholder consultations to be supported by the Global Water Partnership in association with the NAP-GSP.

/ Case studies / English

Kazakhstan: Institutional reform in the water sector to implement the IWRM plan (#342)

In Kazakhstan, the issue is not one of scarcity but of management, a problem that can be solved through applying the principles of IWRM. The government of Kazakhstan consequently initiated a water resources management project aiming at strengthening water management organisations and by instituting the practice of IWRM. In this process, training, workshops and dialogues both within and outside the water sector are crucial. 

/ Case studies / English

India: A tale of rehabilitation of people displaced due to dam construction (#250)

Poor management and planning during the construction of the Bargi Dam created severe social issues. The affected people took action by coming together forming a Union, making demands for fishing rights and protesting against the complete filling up of the dam.  These demands were eventually met. This case illustrates the need for proper dialogue and participation with the affected people during the plan stage of any development projects to prevent problems during execution.

/ Case studies / English

Morocco and Algeria : Irrigation in the Mediterannean Region: Strengthening small and medium scale farmers (#447)

In the Maghreb region food security relies mainly on irrigated agriculture. Centralized water management which lack water users’ involvement causes problems in the quality and quantity of the resource. Alternative models, which include the management of water by users, have strengthened the innovation of small scale irrigation systems and supported the initiation of cooperatives and networks. This case illustrates the value of small scale solutions, cooperation and training.