Search

Sort by: Relevance | Date
/ English

GWPSA holds Validation Workshop on the Limpopo Basin DRR Action Plan

Responding to the dramatic increase in extreme weather events and mega disasters is one of the great challenges of the Limpopo River Basin. Disaster Risk Reduction (DRR) is a top priority for the basin as it seeks to hold back the tide of rising economic and human losses through flood and droughts. To reduce risks from such disasters, GWPSA has over the past 2 years been involved in the development of a disaster risk reduction action plan for the Limpopo Basin. This Plan of Action presents a strategy for integrating disaster risk reduction into the Limpopo transboundary level operations. As part of the process to developing the plan, GWPSA held a workshop on the 5th of April, 2016, to validate the draft DRR action plan of the Limpopo Basin. 

/ English

Technical Background Papers Available in Spanish

Three more GWP Technical Background Papers are now also available in Spanish. GWP’s library of publications written by the Technical Committee is growing, and there are currently 18 background papers. Many of them have been translated into several languages.

/ English

About the project

Stemming from the realisation of the inherent linkages between governance and the mobilisation of financial resources for the water sector, the aim of the Governance & Financing for the Mediterranean Water Sector Project has been to diagnose related bottlenecks and identify plausible and realistic recommendations to help overcome them.
/ English

GWP Presents the New and Improved IWRM ToolBox

Thirteen years after it was first launched, GWP’s online database IWRM ToolBox gets a facelift. It is not the first time a change is made, but it is the most radical. The new version, now integrated with the main GWP website,  has more features and is easier to navigate.