Search

Sort by: Relevance | Date
/ Case studies / English

Australia: Managing salinity risks associated with importing irrigation water into Clare (#292)

In Australia, a new approach to water management was needed to allow imported water to be used for irrigation without increasing the salinity of the soils or groundwater. Action was taken to develop a framework to enable irrigators to identify and to manage the environmental risks associated with the use of River Murray water for irrigation. The key lesson is that a salt management strategy is relevant wherever there are plans to irrigate land. 

/ English

Danube Art Master 2012: Czech Republic wins the competition

Bratislava, 8 October 2012. Czech children have won the "International Danube Art Master 2012" competition, as the International Commission for the Protection of the Danube River (ICPDR) and GWP Central and Eastern Europe announced today.

/ English

WACDEP Partners Share Experiences in Workshop

The 5th WACDEP Technical Coordination Workshop took place in Kigali, Rwanda, 23-28 September. The main purpose was to share experiences and discuss the coordination of implementing WACDEP in the participating GWP regions and countries. WACDEP is a joint AMCOW-GWP programme on water, climate, and development.

/ English

Water: the Connecting Link to Climate Change Adaptation

“An integrated approach to managing and developing the world’s water resources is vital for not only driving world economies, ensuring human well-being and security from hunger, but can also serve as an essential building block for enhancing coherence on adaptation,” said Dr. Ursula Schaefer-Preuss, Chair of GWP at a side event at the Bonn climate change negotiations. “Water is the connecting link because climate impacts are largely felt through the medium of water,” she said.

/ Case studies / English

Lesotho: Strengthening Capacity in Strategic Financial Planning for the Water Supply and Sanitation Sector

To meet demand, the water sector of Lesotho is undertaking institutional reforms and tackling financial and technical constraints. Action was initiated through a study conducted in four phases including data collection, development options, financing strategy and integration of the findings. The project was carried out in through capacity building activities in cooperation with several stakeholders. Predominantly, this case study illustrates the importance of combining data from several authorities into one consistent format.