Search

Sort by: Relevance | Date
/ English

Rainwater Harvesting in Trinidad

GWP Caribbean together with its partner the Water Resources Agency (WRA) has established a Rainwater Harvesting (RWH) system within the Fondes Amandes community in St. Ann’s Trinidad. The RWH system is patterned after a system based on best practices. The installation of the system is part of GWP Caribbean’s contribution to the project Water for Life: The Trinidad and Tobago Initiative.

/ Case studies / English

China Hebei: Development and management of groundwater irrigation in Hengshui (#312)

Hebei has only met water demand through overdraft of deep groundwater, resulting in the formation of a groundwater overdraft depression. This issue is further exacerbated by saline water intrusion into the groundwater tables. The water administrative department has taken measures accounting for IWRM principles, for example by establishing the Water Users Association to encourage participatory management. The lesson learnt is the value of a participatory approach in management.

/ Case studies / English

Transboundary: Basin Economic Allocation Model (BEAM); An Economic Model of Water Use Developed for the Aral Sea Basin (#432)

Steadily shrinking for decades due to unsustainable irrigation policies, the Aral Sea is under increasing pressure, making both allocation and availability major challenges. Action has been taken and the Basin Economic Allocation Model has been developed as a long-term decision support system to facilitate putting “value on water use”. This demonstrates that economic models can be applied to assess economic value maximization of different water uses.

/ Case studies / English

India: Capacity Building for Improved Water Management in Andhra Pradesh (#359)

India is currently facing huge challenges in water management, including disputes on reservoir releases, over-exploitation of groundwater resources, degradation of wet lands, salt-water intrusion in coastal regions and shortages in drinking water supply. Action was taken to initiate a pilot research project to generate and disseminate knowledge. This case study illustrates that pilot demonstrations and capacity building are a prerequisite for promoting improved water management practices to all stakeholders. 

/ Case studies / English

Jordan: From water service provision to planning and management in the Jordan valley authority (#161)

In order to meet new demands, the Jordan Valley Authority was in need for reform. Action was taken to initiate a public strategic planning process led by a steering committee composed of all relevant stakeholders and various working groups. The case consequently illustrates how an integrated strategic planning process can create conditions under which all stakeholders can be involved in the proposed institutional reform.

/ Case studies / English

China: Eco-Compensation for Watershed Services in the People’s Republic of China (#422)

With one of the lowest per capita freshwater resources in the world, China have been investing in and seeking new ideas and methods for improving both supply side and demand side management of water resources. This has included numerous experiments in “eco-compensation”. These experiences demonstrate that eco-compensation should be considered as a potential tool for Integrated River Basin Management to address financing shortfalls, identify management pitfalls, and convince key stakeholders to participate.

/ English

Caribbean Water Ministers Meet to Address Wastewater Policy and Financial Challenges

Bridgetown, Barbados, September 18, 2013: Ministers with responsibility for Water in several Caribbean countries will gather at the 9th High Level Session (HLS 9) Ministerial Forum which takes place on 10 - 11 October 2013 at the Hilton Barbados Resort. This Ministerial Forum is part of the Caribbean Water and Wastewater Association’s (CWWA’s) 22nd Annual Conference and Exhibition, which is being hosted by the Barbados Water Authority (BWA).