For many businesses, issues of water scarcity are becoming increasingly relevant to their activities, manifested as increased costs or difficulties to obtain water as users compete for rights. To understand water dependencies in time and space, many companies apply the measure of water footprint, estimating water use throughout the value chain. Using this measure can give important insights into variation between countries in terms of how much of the water relates to production.
To supply water to a growing population, an aqueduct was built in the watershed of El Limón River in Tovar municipality. However, this aqueduct does not provide sufficient supply, creating conflicts among the communities. To solve these, agreements on the use and conservation of water resources have been made among the communities, involving both rural villages and urban areas. This illustrates the benefits of a participatory approach.
In Carabobo State, the urban and agricultural expansions are the main causes of watershed problems resulting from degradation of forests, deforestation and inadequate solid waste management. Since 2009, action has been taken to combat these developments through participatory public policies which focus on environmental education and sustainable development. The key to the success of the project has been extensive capacity building in combination with concrete management tools.
The quality of groundwater recharging the Guarani aquifer is threatened in some areas by rapid land-use changes, and locally by rapid urbanisation. Action was taken by the World Bank through a GEF-funded project on the ‘Sustainable Development & Environmental Protection of the Guarani Aquifer’, which included scientific studies, institutional provisions and transboundary groundwater management. This case study reinforces the lesson to ‘think globally but act locally’.
In Chile, water has been privatised. However, in order to make sure that access was still available to all strata of society, the privatisation was accompanied by a robust regulatory framework, including a system of direct subsidies for drinking water consumption and sewage services for low income households. This case thus illustrates that in case of privatisation, a direct subsidiary scheme should be considered.
The Municipality of Talcahuano because of rapid urbanisation is subjected to natural resource degradation. Action was taken and a municipal strategy was created, assigning the municipality as the institution in charge of administering and combating natural resource degradation. This case illustrates the appropriateness of the municipal level of government in successfully addressing the recovery of water resources and environmental management.
The water resources of Brazil are subjected to pollution and mismanagement. Furthermore, it is susceptible to urban flooding and land-slides. To address these issues, action was taken to increase funding to the National Water Agency. In terms of IWRM, the key lesson learnt is the need for strong and well-funded executive agencies capable of putting laws into practice.
The Toledo River basin is increasingly contaminated due to unsustainable agricultural practices, Action was taken through a UNESCO-IHP project aiming to perform an integrated environmental assessment of agricultural and farming production systems located in the Toledo River Basin. By using a multi-criteria approach, it was possible to highlight the interactions and use of natural capital, human-driven resources, and ecosystem services supporting agricultural and farming production systems.
A large proportion of Brazil’s population is lacking access to water and sanitation, and development is slow, in particular in rural areas due to lack of funds and political will, but also due to inefficiency in the resources allocation. Action has been taken by the State of Ceará to implement the model called Integrated Rural Water Supply and Sanitation System, illustrating that the most important component of attaining sustainable management is user participation.
The Eastern area of Tucuman province was faced with significant problems of contaminated water. Extensive research was done, involving universities, and a project was carried out, applying the aspects of IWRM within the areas of technical solutions, institutional arrangements of future water supply operation. This case study highlights the importance of conducting research prior to a project to attain sufficient information.