Dr. Letitia A. Obeng took over the reins as Chair of the Global Water Partnership (GWP) on 1st January 2008.
Given her strong background in water and development we asked her about GWP and its role in sustainable development.
Media Advisory, February 21, 2011 -- South Asia is among the areas expected to be hardest hit by climate change. Severe flooding in 2007 along the Ganges and Brahmaputra rivers affected over 13 million people in Bangladesh; flooding in Pakistan in 2010 severely affected 20 million people. India has likewise suffered numerous events of extreme rainfall, flooding and droughts. In addition the rise of sea level is a real threat to low lying areas in Bangladesh and Sri Lanka. And there are the floods going on today in Sri Lanka.
Interview with Bruce Lauckner, Head of Strategic Alliances at Caribbean Agricultural Research and Development Institute (CARDI)
GWP China hosted the GWP Steering Committee Meeting which was held from May 18 to 21, 2010 in Beijing.
The Workshop on Low-carbon Economy and Rational Use of Water Resources was held jointly by GWP China Hebei and Hebei Senior Scientists Association in Shijiazhuang City, Hebei Province on October 11, 2010 with support by GWP China, Hebei Provincial Science and Technology Association, Hebei Provincial Department of Water Resources and Hebei Provincial Power Grid Corporations.
The Sino-Swiss Cooperation Dialogue was taken place in the office building of the Ministry of Water Resources on October 19, 2010.
Cameroon lies between 2° and 13° north latitude and between 8° and 16° east longitude in west central Africa. The country has a total land area of about 475,440 sq. km and a coastline of 402 km and its climate varies with the terrain. This is characterized by high year-round temperatures and the weather is controlled by equatorial and tropical air masses.
Tunisia is located in North Africa, between longitudes 7° and 12° East and latitudes 32° and 38° North. It is at the junction of the West and East Mediterranean, and covers a 164.000 km2 surface.
8-10 December 2009, Bishkek, Kyrgyzstan
This was the third time in the history of GWP CACENA when the region met in Kyrgyzstan. Halfway through the year the regional work plan had to be changed and the Annual Stakeholders Conference (Regional CP) was cancelled, due to uncertainties in the funding of the Work Plan.
The RC meeting was attended by council members and partly by regional TEC member from all eight countries participated in the meeting.