Search

Sort by: Relevance | Date
/ Case studies / English

India: A tale of rehabilitation of people displaced due to dam construction (#250)

Poor management and planning during the construction of the Bargi Dam created severe social issues. The affected people took action by coming together forming a Union, making demands for fishing rights and protesting against the complete filling up of the dam.  These demands were eventually met. This case illustrates the need for proper dialogue and participation with the affected people during the plan stage of any development projects to prevent problems during execution.

/ Case studies / English

Eritrea: Vital aspects of the Eritrean IWRM planning process (#366)

Driven by the Water Resource Directorate of the Ministry of Land, Water and Environment, Eritrea initiated IWRM implementation in 2005. Several steps were taken including the drafting of a water situation analysis report, identifying strategic areas and major gaps for IWRM implementation, and completing an IWRM Action Plan. The lesson which should be drawn from this case study is the importance of proper management of the planning process and building capacity for IWRM.  

/ Case studies / English

Uzbekistan: Improved irrigation based on IWRM approaches (#435)

Uzbekistan is experiencing water scarcity, an issue which will be exacerbated with increased demand. Although policies exist, the water seldom reaches the end water users. To combat this issue, action has been taken by GWP Uzbekistan to conduct trainings and workshops on the dissemination of IWRM to encourage a participatory multi-sector approach. This case study illustrates the importance of public awareness, and the need for work to be conducted at all levels. 

/ English

Sharing Lessons on Water Management Issues in South Asia

GWP SAS is arranging a workshop with the aim to share lessons and experiences on current water management issues, opportunities and challenges faced by the deltaic regions in South Asia, including impending climate change impacts.

/ Case studies / English

The Bahamas: The IWRM Planning Process in the Bahamas (#414)

The water resources of The Bahamas are threatened by over-abstraction, misuse and pollution. In the past, water management in the Bahamas has been conducted through a single-sector approach. To address its issues, actions have been taken to move towards IWRM and a multi-sector approach. In particular, attention has been focused on improving stakeholder participation and advancing political commitment. Presently only being partially successful, IWRM implementation in Bahamas highlights that it is a long term process. 

/ Case studies / English

Transboundary organization in the Niger River Basin (#46)

The Niger River basin is of importance to the region. The Niger Basin Authority was established to foster, promote and co-ordinate studies and programs relating to the Niger River basin. Today the authority is required to promote co-operation among the member countries and to ensure integrated development of its resources. This case illustrates and provides key insights into transboundary river basin management. 

/ Case studies / English

Transboundary: Rural livelihoods and irrigation management transfer in Fergana valley of Central Asia (#362)

With the collapse of the USSR, the water sector seized to be subsidised leading to deterioration of basic infrastructure. Action was taken to partially transfer the responsibility for operation and maintenance of irrigation systems to water users. Nonetheless, this has had limited success because it has been seen as an additional cost rather than benefit. This illustrates that for this to work, the returned benefits need to be higher than the costs. 

/ Case studies / English

Spain: Managing water demand in the upper Guadiana basin (#18)

For centuries the Upper Guadiana Basin has been irrigated with groundwater, resulting in a drop in the water table of more than 20 meters. Actions were taken to address this issue, including regulations restricting aquifer abstraction and economic incentives to encourage farmers to improve irrigation efficiency and plant alternative crops. The key lesson learnt is that surface and underground waters cannot be managed separately.