Search

Sort by: Relevance | Date
/ English

GWP and OECD Launch Global Dialogue Project

Global Water Partnership and the OECD have launched a joint project to establish a Global Dialogue on Water Security and Sustainable Growth. The major output of the cooperation will be a milestone report to be presented at the World Water Forum in 2015 in South Korea.

/ Case studies / English

Eritrea: Vital aspects of the Eritrean IWRM planning process (#366)

Driven by the Water Resource Directorate of the Ministry of Land, Water and Environment, Eritrea initiated IWRM implementation in 2005. Several steps were taken including the drafting of a water situation analysis report, identifying strategic areas and major gaps for IWRM implementation, and completing an IWRM Action Plan. The lesson which should be drawn from this case study is the importance of proper management of the planning process and building capacity for IWRM.  

/ Case studies / English

India: A tale of rehabilitation of people displaced due to dam construction (#250)

Poor management and planning during the construction of the Bargi Dam created severe social issues. The affected people took action by coming together forming a Union, making demands for fishing rights and protesting against the complete filling up of the dam.  These demands were eventually met. This case illustrates the need for proper dialogue and participation with the affected people during the plan stage of any development projects to prevent problems during execution.

/ English

Sharing Lessons on Water Management Issues in South Asia

GWP SAS is arranging a workshop with the aim to share lessons and experiences on current water management issues, opportunities and challenges faced by the deltaic regions in South Asia, including impending climate change impacts.

/ Case studies / English

Uzbekistan: Improved irrigation based on IWRM approaches (#435)

Uzbekistan is experiencing water scarcity, an issue which will be exacerbated with increased demand. Although policies exist, the water seldom reaches the end water users. To combat this issue, action has been taken by GWP Uzbekistan to conduct trainings and workshops on the dissemination of IWRM to encourage a participatory multi-sector approach. This case study illustrates the importance of public awareness, and the need for work to be conducted at all levels. 

/ Case studies / English

The Bahamas: The IWRM Planning Process in the Bahamas (#414)

The water resources of The Bahamas are threatened by over-abstraction, misuse and pollution. In the past, water management in the Bahamas has been conducted through a single-sector approach. To address its issues, actions have been taken to move towards IWRM and a multi-sector approach. In particular, attention has been focused on improving stakeholder participation and advancing political commitment. Presently only being partially successful, IWRM implementation in Bahamas highlights that it is a long term process. 

/ Case studies / English

Transboundary: Rural livelihoods and irrigation management transfer in Fergana valley of Central Asia (#362)

With the collapse of the USSR, the water sector seized to be subsidised leading to deterioration of basic infrastructure. Action was taken to partially transfer the responsibility for operation and maintenance of irrigation systems to water users. Nonetheless, this has had limited success because it has been seen as an additional cost rather than benefit. This illustrates that for this to work, the returned benefits need to be higher than the costs.