Search

Sort by: Relevance | Date
/ English

Urban Flood Framework for Dhaka

The Center for Environmental and Geographic Information Services (CEGIS), supported by GWP Bangladesh, has conducted a study on managing flood risks for Dhaka in the face of climate change. The study resulted in a concept note on Climate Resilient Urban Flood Risk Management Framework for Dhaka.

/ English

GWP and OECD Launch Global Dialogue Project

Global Water Partnership and the OECD have launched a joint project to establish a Global Dialogue on Water Security and Sustainable Growth. The major output of the cooperation will be a milestone report to be presented at the World Water Forum in 2015 in South Korea.

/ English

Urban Flood Framework for Dhaka

The Center for Environmental and Geographic Information Services (CEGIS), supported by GWP Bangladesh, has conducted a study on managing flood risks for Dhaka in the face of climate change. The study resulted in a concept note on Climate Resilient Urban Flood Risk Management Framework for Dhaka.

/ Case studies / English

Costa Rica: Environmentally Adjusted Levies for Water Use (#378)

The Costa Rican government decided to revise its system of water use levy when it became evident that it was disproportionately low. Action was taken by key stakeholders to reconstruct a design of the water use levy to reflect two basic elements of water charge: water use rights and environmental water services. From this experience, the most important lesson is that political will must support legal and technical works when reforming economic instruments.  

/ Case studies / English

Burkina Faso: Action Plan for IWRM (#338)

Confronted with serious water issues constraining development, Burkina Faso decided to implement IWRM. The process has been conducted following three key steps: 1) assessing the status, 2) adapting the legal framework to IWRM principles and 3) Identifying key water resources management issues and developing an action plan. The main lesson learnt is that political will at the highest levels should be established at an early stage.