The theme of the GWP Communications training workshop 9-13 December 2013 was "Developing a Communications Strategy".
In Central America there are 23 transboundary basins which represent approximately 36.9% of the territory. But in most there are no joint agreements for their management. That is why GWP Nicaragua and the Latin American Water Tribunal (TLA) coordinated the regional forum, "Water in Central America: Opportunities for conflict resolution."
The legal and regulatory framework of water utilities in Peru provides opportunities for local financing of investments. Despite this, the sector remains heavily dependent on public financing. Action has been taken by the World Bank to initiate a study investigating the barriers to local private funding. This case study illustrates that public loans, private loans and equity investment are appropriate to fund the necessary investment.
To supply water to a growing population, an aqueduct was built in the watershed of El Limón River in Tovar municipality. However, this aqueduct does not provide sufficient supply, creating conflicts among the communities. To solve these, agreements on the use and conservation of water resources have been made among the communities, involving both rural villages and urban areas. This illustrates the benefits of a participatory approach.
In Central Asia, water is unevenly distributed with states positioned downstream being placed in a very unfavourable position. The situation is further complicated since the benefits from cooperation are highly asymmetrical. Despite the challenge, the states have taken action and entered into a regional agreement, which attracted the international donor community to engage further. This case illustrates how international initiatives can influence institutional arrangements in transboundary basins.
The Bodrog River Basin is exposed to severe flooding caused by jumbled urbanisation and low connectivity between land (agriculture and forestry), urban and water planning. Management is made more complex by the transboundary nature of the basin. A project was, however initiated to strengthen cooperative management and to mitigate consequences of floods through achieving consistent and holistic management of flood risk in three basin countries. This case illustrates the importance of transboundary flood management.
Egypt’s water resources are severely constrained. This calls for increasing the water use efficiency by improving irrigation management practice, as the agriculture sector is the main user of water resources. To address the issue, an Irrigation Improvement Programme was initiated, including a combination of technical changes and infrastructure investment. The case clearly demonstrates the importance of building appropriate institutional structures in parallel to the introduction of technical changes.