Egypt’s water resources are severely constrained. This calls for increasing the water use efficiency by improving irrigation management practice, as the agriculture sector is the main user of water resources. To address the issue, an Irrigation Improvement Programme was initiated, including a combination of technical changes and infrastructure investment. The case clearly demonstrates the importance of building appropriate institutional structures in parallel to the introduction of technical changes.
The lowland valley of Chancay-Lambayeque watershed is scarce of water resources, forcing farmers to irrigate with insufficiently treated waste water, resulting in severe health issues. Action was taken through the project “Future Development of San José farmer community: Wastewater” which was a collaboration between the private and the public sectors, aiming to illustrate alternative ways to irrigate. The most important lesson is that cooperation is an important instrument for development.
During the first quarter of 2013, CWP-Benin was busy with the final work (technical and financial reports, project final report; capitalization report) of the Multiannual program to support Water and sanitation sector (PPEA) phase I implemented by CWP-Benin which was completed in December 2012. Similarly, the CWP has also participated actively in the formulation and the launching of phase 2 of the program which will run over three years from 2013 to 2015.
Activities such as horticulture and tourism around the Great Barrier Reef create sediment, nutrient and pesticide runoff, placing increased pressure on the ecosystem. The World Wildlife Fund has taken action, predominantly by raising awareness. The key lesson is how a carefully orchestrated campaign can convince decision-makers of the importance of integrated river basin management as a means of reducing land-based marine pollution.
The district of Tikamgarh has faced severe water scarcity. Action was thus taken to implement concrete measures to restore the water bodies in the surrounding area. Together with relevant stakeholders, the district administration initiated and implemented the project. The key lesson to draw from this case is the need for the participation by all relevant groups.
The Upper Veda Project involves a dam that would submerge 14 villages. Opposing the project, the affected communities took action and urged for alternative solutions. The dam was eventually constructed, but the process was characterised by conflicts between the project authorities and the communities. This case illustrates that dam projects, which directly affect the livelihoods of large numbers of people, need to have developed a well defined rehabilitation plan prior to construction.
The Tisza River is faced with deteriorating water quality as well as floods with increasing frequency and levels. These issues are exacerbated by climate change. Action has been taken, both by national authorities, international actors and NGOs to develop more adaptive management schemes. The key lesson is that in water management, the biggest problem is the weak coordination among different fields and interests – such as agriculture, nature, navigation, flood defence.