Search

Sort by: Relevance | Date
/ English

We are the River Ranger!

RIVER Ranger Training of Trainers (ToT) - Community River Monitoring Programme focused on empowering the officers within the Department of Irrigation and Drainage (DID) nationwide who are the guardian of the Malaysian rivers trained as qualified RIVER Rangers.
/ English

COP 18 at Doha – it’s now about adaptation

One thing became clear at the Doha climate negotiations. As governments struggle to reach any agreement on climate mitigation, the urgency and importance of agreement on adaptation is now coming to the fore.

/ Case studies / English

Brazil: Integrated environmental assessment of agricultural production systems in the Toledo River Basin (# 441)

The Toledo River basin is increasingly contaminated due to unsustainable agricultural practices, Action was taken through a UNESCO-IHP project aiming to perform an integrated environmental assessment of agricultural and farming production systems located in the Toledo River Basin. By using a multi-criteria approach, it was possible to highlight the interactions and use of natural capital, human-driven resources, and ecosystem services supporting agricultural and farming production systems. 

/ Case studies / English

Transboundary: Trans-border management group for the conservation of the environment of the Goascoran River, Honduras and El Salvador (#320)

The Goascoran River basin is shared by Honduras and El Salvador and is of great environmental, economical and geopolitical importance. In 2006, action was taken to create a multi-sector instance to integrate, influence and coordinate sustainable management of the shared basin. This experience is of great value for IWRM, as the management group establishes a model of work for transboundary management.

/ English

International Year of Water Cooperation

The United Nations has declared 2013 the International Year of Water Cooperation. The 2013 World Water Day, on 22 March 2013, is also dedicated to water cooperation.

/ English

The Mono Basin Authority established

The constitutive texts for the establishment of the Mono River Basin Authority (MBA) have been approved by the two countries (Benin and Togo) after a meeting of Ministers on July 4th, 2014 in Cotonou. The meeting of Ministers was preceded by a meeting of experts on 2 and 3 July 2014 to analyze documents that were approved by Ministers.