The Center for Environmental and Geographic Information Services (CEGIS), supported by GWP Bangladesh, has conducted a study on managing flood risks for Dhaka in the face of climate change. The study resulted in a concept note on Climate Resilient Urban Flood Risk Management Framework for Dhaka.
GWP Myanmar (MmWP) held a Workshop on Integrated Flood Management in Bago River Basin at the time of Climate Change on 3rd August 2015 at Irrigation Technology Center, Bago.
Bago River situated in the Bago Region has occurred frequent flooding in the rainy season especially in July and August. The occurrence of flooding in recent period is more prominent due to the impact of climate change. Although certain activities of structure measure have been done to prevent flooding, there has been necessary to introduce non-structure measure approach to combat the flood disaster.
In this workshop, it is intended to organize multi-stakeholders from the Bago River Basin to discuss Integrated Flood Management and adopt this approach to sustain the livelihood and socio economic conditions of the people who are residing in this river basin. The dialogue was organized by MmWP and Irrigation Department, Ministry of Agriculture and Irrigation of the Union of Myanmar with sponsorship support from GWP SEA.
The International Conference on Drinking Water Safety in Arid Areas for exchanging views and sharing experiences in ensuring safety of drinking water in the arid areas.
In Thailand the risk disaster early warning system has been designated by law to the department of the disaster prevention and mitigation. However, the representation of the department is only at the provincial level. The assistance from the department has been seen as not enough and not in time and communities were stimulated to recognize their own risk and the need to work together to solve or reduce the flood risk.

The Burkina Faso CWP has launched a call for applications for the recruitment of a consultant to carry out the study on the "Analysis of the current use of water resources leading to the definition of the situation reference to the use of water on the portion of the territory of Burkina Faso located in the Mekrou basin and the studies on existing IWRM plans, policies and green growth strategies and managing situations of drought and flood, energy policies and poverty reduction strategies in Burkina Faso" and the validation workshop of results by all actors of Burkina Faso. The same is done by CWP Benin and CWP Niger.
The programme runs for 5 years with an estimated cost of 12.7 million euro.
GWP China has launched a new bilingual website, offering the latest GWP news from the region. Now all 13 GWP Regional Water Partnership websites share the same platform and branding.
Setting up of institutional mechanisms, legal status issues, and developing biological monitoring standards, were discussed at a workshop on monitoring and assessment methods for river and lake health, organized by GWP China on January 13, 2012, in Beijing.