GWP Knowledge search

Sort by: Relevance | Date

Latest publications

/ Case studies / English

Transboundary: Building Climate Change Resilience through Community Action - the Case of Lake Cyohoha in Bugesera (#484)

Lake Cyohoha and its 508 kmwatershed in the Bugesera region marks the border between Southern Rwanda and Northern Burundi. In the GWP WACDEP climate resilience project, stakeholders analyzed the situation and decided for actions. Drought resistant trees were planted, water points installed and connected to a supply network, fuel saving stoves and biogas was introduced and capacity development events were held. 

/ Other / English

Video Game

The Alter Aqua Video Game is a tool to raise awareness and sensitize primary and secondary school students on the use of Non Conventional Water Resources and the importance of saving water every day!
/ Technical Focus Papers / English

New Paper on Transboundary Water Management in Central America

The Central America region is generously endowed with water resources, but concerns are growing about water scarcity in parts of the region. This can mean both a physical lack of water and a lack of mechanisms and actions for effectively managing, allocating, and developing water resources. A new GWP Technical Focus Paper focuses on these issues.
/ Other / English

Awareness Raising on Basin Management Approach

On 28 September 2016, the CamboWP conducted Awareness Raising on Basin Management Approach with 18 participants who are Commune Council Members, Village Leaders and Deputy Leaders and Villagers of the Baray Commune which is located in the Mekong Floodplain.
/ Perspectives papers / English

Linking Ecosystem Services and Water Security

Human well-being depends on products and services that aquatic ecosystems provide. But historically, development has largely ignored this dependency.
/ Other / English

ANNUAL PLAN AND REPORT

GWP Annual Report Files consist of the annual monitoring summary on: progress markers, logframe indicators, implementation of planned activities and self-assessment on progress around critical GWP functions. By wrapping up the annual performance, all RWPs are requested to draft out the the planned set of activities to be implemented in next year. The work plan files consist of context and workplan summary, detailed workplan and budget.