Search

Sort by: Relevance | Date
/ English

Accelerating project preparation and financing water projects in Africa

Africa's population is projected to reach 1.6 billion by 2030, which translates into a need to produce at least 50% more food; and at least a tenfold increase in water needs for energy production to support socio-economic development. These challenges and the resultant increase in water demand are further aggravated by rapid urbanization and industrialisation. This requires huge investments in water to satisfy the social and economic demands among other things.
/ English

IDMP follow up mission in Burkina Faso

The IDMP project manager together with CWP Burkina and some GWP WA staff have visited the pilot project site wher innovating practices of resilience to drought are promoted in Komki Ipala. The visitors were much satisfied with results achieved by the pilot project which initiated various techniques of restoration of degraded lands to produce grass for animal feeding through natural assisted regeneration. These technics are mastered by the populations involved in the project. To show their mastery they are testing a long time abandoned land to grow some crops.
/ English

Manager of Communications and Visibility

Interested candidates for this position should submit or email their formal application and resume not later than 12:00 (Noon) on 20th August, 2018 to The Executive Secretary, African Ministers’ Council on Water (AMCOW),No. 11, T.Y. Danjuma Street, Asokoro District, Abuja, Nigeria or via email on: secretariat@amcow-online.org