Search

Sort by: Relevance | Date
/ Case studies / English

Slovenia: Ecosystem restoration of Lake Cerknica (#448)

Lake Cerknica is one of the most important Slovenian Karst sights known worldwide. The phenomenon of intermittent (disappearing) Lake Cerknica has become famous worldwide as an area where cattle can graze, farmers can plow fields, catch fish and drive boats in the same place. A project (2007-2009) supported by EU funding (LIFE06NAT/SLO/000069) aimed to restore the unique ecosystem of Lake Cerknica. This project was possible due to a favorable legal setting - Lake Cerknica was included in a European network of nature protection areas Natura 2000. In 2006 it was registered as Ramsar site

/ English

WACDEP supports VBA on two relevant studies

The Minister of Water, Hydraulic equipment and Sanitation of Burkina Faso, Ms. Mamounata BELEM / OUEDRAOGO, presided over the official ceremony of the validation workshop of two studies on June 3, 2014 at the Palm Beach Hotel in Ouagadougou.

/ English

The Seminar of UNIDO for presenting latest Industrial Development Report

On March, 21, 2014, around 50 participants, including representatives of the diplomatic corps and representatives of the UN agencies Beijing Offices and private sectors, attended a seminar organized by the China Office of the United Nations Industrial Development Organization (UNIDO) at the United Nations Development Programme (UNDP) China Office in Beijing.

/ English

Regional high-level conference in Almaty

On 27-28 May 2014 in Almaty, Kazakhstan there was held the Regional Conference "Prospects of water resources management in Central Asia: From the river basin approach to regional cooperation".

/ English

Promoting Water Security through CPWF Research in the Limpopo River Basin

As a way of supporting the CGIAR Challenge Programme for Water and Food (CPWF, 2009-2013), approach in the Limpopo River basin, GWP SA is undertaking work for the Agricultural Research Council (ARC) to specifically package and disseminate the small scale infrastructure work package, a CPWF Research package that was undertaken on the Limpopo River Basin between 2009 -2013. The assignment with the ARC began in May 2014 and will be implemented until the end of 2014.

/ English

Program Manager's visiting tour to CWPs

Preliminary planned Project Manager’s trip to the pilot sites at the end of 2013 could not be implemented due to various organizational, financial and visa problems. Starting from the first quarter of 2014 the familiarization with the ongoing work on the program pilot sites began in coordination with the national project teams.