Search

Sort by: Relevance | Date
/ English

The Water Challenge

The Eastern Africa region and Greater Horn of Africa experience the highest climate variability thus causing persistent prolonged droughts, erratic floods and untimely rainfall patterns
/ English

Forecasting & Modeling Approaches for the Flood Caused

Following a period of unusual heavy monsoon precipitation that started in mid-July and continue into August 2015, Myanmar experienced the most severe flooding in decades. The rainfall is associated with the south-west Monsoon, which occurs each year, but the situation got worse after the land fall of Cyclone Komen in Bangladesh on 30th July 2015 which brought strong winds and additional heavy rain to (north) Myanmar.

/ English

PROGRAMMES BY THEME

Global Water Partnership Southern & Africa Coordination Unit has the following portfolio of main programs and projects:
/ English

GWP in the News 2013

A collection of news items featuring the Global Water Partnership or GWP representatives.

/ English

A leap to the drafting of the project document for the setting up of an early warning system in the Lake Chad basin area.

Within the framework of developing a full project proposal on the establishment of an Early Warning System in the Lake Chad Basin area, GWP-CAf and LCBC organized a workshop on the approval of the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants, charged to produce a full-fledged project document.  The workshop was held from 11-12 of July 2016 in Ndjamena, Chad.

 

The attendees to this meeting were 8 experts (in hydrology, climate change) and 4 support staff from the LCBC executive secretariat, 3 experts from German Cooperation groundwater and climate change adaptation projects, the coordinator of the programme to rehabilitate and strengthen the resilience of lake chad basin systems (PRESIBALT), 2 representatives of GWP Central Africa, and the team of three recruited consultants (2 experts of PEGASYS from South Africa and 1 independent consultant from Chad).

 

The main objective of this meeting was to present, enrich and approve the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants. It was also an opportunity for consultants to meet, share their experiences and strengthen their collaboration. 

/ English

IDMP in Burkina Faso, need to advocate for fundraising

The CWP Burkina Faso held the 2nd meeting of the core group of the platform on Friday 18 November. The exchanges focused on the various fundraising activities carried out, on institutional anchoring, on the organization, operation of the platform and the revision of the texts.