Search

Sort by: Relevance | Date
/ English

Bringing Stakeholders Together in Bolivia

Eighty representatives from a diversity of water–related sectors participated in an informative meeting, held on 22 May 2015 in La Paz, to learn about the advantages of establishing a Country Water Partnership (CWP) in Bolivia.

/ English

Communicators and Researchers Collaborate to Produce Knowledge Products

GWP SA was contracted by the Agricultural Research Council (ARC) to collaborate and lead in a project dealing with the development of knowledge products. The assignment involved packaging and targeting outputs of small scale infrastructure research undertaken in the Limpopo River basin between 2009 -2013.

/ English

Jobs and tenders

On this page we announce current job openings, tender invitations, and internship calls in the GWP network. To stay updated, please check back regularly!
/ English

A leap to the drafting of the project document for the setting up of an early warning system in the Lake Chad basin area.

Within the framework of developing a full project proposal on the establishment of an Early Warning System in the Lake Chad Basin area, GWP-CAf and LCBC organized a workshop on the approval of the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants, charged to produce a full-fledged project document.  The workshop was held from 11-12 of July 2016 in Ndjamena, Chad.

 

The attendees to this meeting were 8 experts (in hydrology, climate change) and 4 support staff from the LCBC executive secretariat, 3 experts from German Cooperation groundwater and climate change adaptation projects, the coordinator of the programme to rehabilitate and strengthen the resilience of lake chad basin systems (PRESIBALT), 2 representatives of GWP Central Africa, and the team of three recruited consultants (2 experts of PEGASYS from South Africa and 1 independent consultant from Chad).

 

The main objective of this meeting was to present, enrich and approve the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants. It was also an opportunity for consultants to meet, share their experiences and strengthen their collaboration.