Job title: Development Communications Officer
Reporting to: Regional CoordinatorBased: Entebbe, Uganda
The Bodrog River Basin is exposed to severe flooding caused by jumbled urbanisation and low connectivity between land (agriculture and forestry), urban and water planning. Management is made more complex by the transboundary nature of the basin. A project was, however initiated to strengthen cooperative management and to mitigate consequences of floods through achieving consistent and holistic management of flood risk in three basin countries. This case illustrates the importance of transboundary flood management.
The UN-Water annual Zaragoza Conference serves as preparation for the annual World Water Day. GWP representatives participated in several of the sessions.
The GWP Technical Committee, in collaboration with the International Land Coalition (ILC) and the International Water Management Institute (IWMI), organized a workshop on the “Global Food Security Challenge through Coordinated Land and Water Governance”. The event took place 15-16 June in Pretoria, South Africa.
Explore the Caribbean Water and Climate Knowledge Platform.
The Indus River is a major transboundary river in Asia with nine tributaries. The River is about 2,800km long, with 2,682 km in Pakistan. The Indus drainage basin covers an area of about 1,140,000 km2 stretching from Afghanistan through China, India, and Pakistan. Monsoonal rains are the most important flood-causing factor in the Indus basin, followed by the size, shape, and land-use of the catchments as well as the conveyance capacity of the corresponding streams. The monsoon rains fall from June to September, and are generally intense and widespread.
Small Island Developing States (SIDS) are deemed to be some of the most vulnerable countries in the world to climate change. This is in part attributed to sea-level rise, coupled with the small size of these territories amidst growing populations and other development challenges. Of these development challenges, achieving water security remains an enduring issue which will only be further exacerbated by the threat of climate change.
Driven by the Water Resource Directorate of the Ministry of Land, Water and Environment, Eritrea initiated IWRM implementation in 2005. Several steps were taken including the drafting of a water situation analysis report, identifying strategic areas and major gaps for IWRM implementation, and completing an IWRM Action Plan. The lesson which should be drawn from this case study is the importance of proper management of the planning process and building capacity for IWRM.