Towards a more active youth role in water resources management and climate change adaptation.
The CWP Niger has coordinated with the consultants to send data in the framework of the Mékrou Project and tackling some burning issues in relation with data collection in the country.
The GWP Cameroon hosted in Yaounde, the 8th WACDEP Technical Coordination meeting from the 28-30th September 2016.
Attendees to this regional meeting were the members of WACDEP Coordination Unit, regional and national WACDEP program Managers from the five Regions (GWP Med, GWP SA, GWP EA, GWP WAf and GWP CAf); the GWP-O Head of Program and the GWP-Cameroon Chair who led the GWP-CAf team.
The last technical coordination meeting held in Yaounde over three days had double main objectives. The first objective was to define the approaches for the regions and Country Water Partnerships (CWPs) to better handle the project document preparation process of WACDEP 2 and agree on the timelines of submitting the document to WACDEP Coordination Unit (WACDEP CU) for review. Therefore, two approaches were proposed with regards to the budget constraints: (a) to recruit a consultant for facilitating the process and (b) to constitute a team of experts of the WACDEP Technical Working Group (TWG) to develop the project documentation with a support from the WACDEP CU.
The second one was to agree on the roadmap for drafting the WACDEP (2011-2016) final report to submit it by 15 of October 2016.
Responding to the dramatic increase in extreme weather events and mega disasters is one of the great challenges of the Limpopo River Basin. Disaster Risk Reduction (DRR) is a top priority for the basin as it seeks to hold back the tide of rising economic and human losses through flood and droughts. To reduce risks from such disasters, GWPSA has over the past 2 years been involved in the development of a disaster risk reduction action plan for the Limpopo Basin. This Plan of Action presents a strategy for integrating disaster risk reduction into the Limpopo transboundary level operations. As part of the process to developing the plan, GWPSA held a workshop on the 5th of April, 2016, to validate the draft DRR action plan of the Limpopo Basin.
Caribbean countries face a number of challenges in maintaining adequate supplies of water for their populations. Challenges range from low annual rainfall levels to inadequate storage, polluted water sources, and poor management of existing water resources.