Search

Sort by: Relevance | Date
/ English

Agreement to link IWRM and ICZM in the Buna/Bojana river

With a focus on the Buna/Bojana transboundary river (shared between Albania and Montenegro), a methodology is being developed that effectively links IWRM and ICZM (integrated coastal zone management). This work includes developing a joint IWRM/ICZM generic planning framework and working towards the launch, in 2012, of the joint IWRM/ICZM Plan for this specific transboundary basin.

/ English

Wastewater management plan developed in Botswana using an integrated approach

While pollution problems have long been acknowledged in the Okavango Delta, it was the Botswana IWRM-WE Plan project (facilitated by GWP Botswana, led by Botswana's Department of Water Affairs, and funded by UNDP GEF) which brought stakeholders and institutions together to act on the issue. This contrasted with the isolated, ad hoc project and departmental actions that had gone before.

/ English

Upgrading Flood Information in Pakistan

In 2010, the devastating floods in Pakistan directly affected about 20 million people, mostly by destruction of property, livelihood and infrastructure. GWP Pakistan is now collaborating with UNESCO to launch a project in cooperation with the Government of Japan that aims to upgrade the flood forecasting and early warning systems of Pakistan, and to conduct risk mapping of flood plains along the Indus River.

/ English

Upgrading Flood Information in Pakistan

In 2010, the devastating floods in Pakistan directly affected about 20 million people, mostly by destruction of property, livelihood and infrastructure. GWP Pakistan is now collaborating with UNESCO to launch a project in cooperation with the Government of Japan that aims to upgrade the flood forecasting and early warning systems of Pakistan, and to conduct risk mapping of flood plains along the Indus River.

/ Case studies / English

Estonia: Viru and Peipsi Catchment Area Management Plan (#356)

Oil-shale mining and oil-shale based electricity production has caused serious damage to ground and surface water in the Viru-Peipsi catchment area in Estonia. Action was taken to enhance the protection of the water resources through a project that set out a management plan. The project included data collection, monitoring and capacity building. Due to the success of this project, it can be used as an example for future developments. 

/ English

Wastewater management plan developed in Botswana using an integrated approach

While pollution problems have long been acknowledged in the Okavango Delta, it was the Botswana IWRM-WE Plan project (facilitated by GWP Botswana, led by Botswana's Department of Water Affairs, and funded by UNDP GEF) which brought stakeholders and institutions together to act on the issue. This contrasted with the isolated, ad hoc project and departmental actions that had gone before.