Search

Sort by: Relevance | Date
/ Case studies / English

Pakistan: Indus Basin Floods; Mechanisms, Impacts, and Management (#445)

The Indus River is a major transboundary river in Asia with nine tributaries. The River is about 2,800km long, with 2,682 km in Pakistan. The Indus drainage basin covers an area of about 1,140,000 km2 stretching from Afghanistan through China, India, and Pakistan. Monsoonal rains are the most important flood-causing factor in the Indus basin, followed by the size, shape, and land-use of the catchments as well as the conveyance capacity of the corresponding streams. The monsoon rains fall from June to September, and are generally intense and widespread.

/ English

International Water Law Training Strengthens Collaboration

A three-day (3-5 August) Africa wide Training on International Water Law (IWL) for improved transboundary water management in Africa has concluded in Entebbe, Uganda. The training attracted 40 participants from 21 countries across the continent; mid- to high-level practitioners from River Basin Organizations (RBOs) and governments.

/ English

GWP supports NAP process in Malawi

Malawi is launching its NAP Process by holding the first ever NAP stakeholder consultations to be supported by the Global Water Partnership in association with the NAP-GSP.

/ English

Call for Water Cooperation at Dushanbe Conference

A GWP delegation participated at the High-Level International Conference on Water Cooperation in Dushanbe, Tajikistan, which took place on 20-21 August. GWP Executive Secretary Dr. Ania Grobicki said the event was a historic opportunity to rethink water.

/ English

Promoting Water Security through CPWF Research in the Limpopo River Basin

As a way of supporting the CGIAR Challenge Programme for Water and Food (CPWF, 2009-2013), approach in the Limpopo River basin, GWP SA is undertaking work for the Agricultural Research Council (ARC) to specifically package and disseminate the small scale infrastructure work package, a CPWF Research package that was undertaken on the Limpopo River Basin between 2009 -2013. The assignment with the ARC began in May 2014 and will be implemented until the end of 2014.

/ English

GWP-C Partners' Databases

The databases highlighted on this page have been developed by our partners and strategic allies. These databases are specially tailored for Caribbean stakeholders to aid in climate resilient decision making for inter alia the water sector.