Search

Sort by: Relevance | Date
/ Case studies / English

Kenya: Shared risk and opportunity in water resources: Seeking a sustainable future for Lake Naivasha (#446)

Lake Naivasha is an internationally renowned Ramsar site located in the Rift Valley in Kenya. But unlike most other designated wetlands of international importance, the water in Lake Naivasha also anchors a flourishing horticultural industry. The Lake Naivasha Riparian Association (LNRA) was established in 1929 to protect local land owner’s rights. and the LNRA became more strident in trying to balance the impact of the expanding commercial interests surrounding the lake with protecting its environmental integrity.

/ English

Websites

This set of documentation describes how the website is built, the Content Management System (CMS), and how to create regional sites (also called microsites). For best practice and learn how to edit and create egaging online content, see the tutorials section.

/ Case studies / English

The Bahamas: The IWRM Planning Process in the Bahamas (#414)

The water resources of The Bahamas are threatened by over-abstraction, misuse and pollution. In the past, water management in the Bahamas has been conducted through a single-sector approach. To address its issues, actions have been taken to move towards IWRM and a multi-sector approach. In particular, attention has been focused on improving stakeholder participation and advancing political commitment. Presently only being partially successful, IWRM implementation in Bahamas highlights that it is a long term process. 

/ Case studies / English

Transboundary: Addressing management issues in a complex environment, Tisza River Basin (#346)

The Tisza River is faced with deteriorating water quality as well as floods with increasing frequency and levels. These issues are exacerbated by climate change. Action has been taken, both by national authorities, international actors and NGOs to develop more adaptive management schemes. The key lesson is that in water management, the biggest problem is the weak coordination among different fields and interests – such as agriculture, nature, navigation, flood defence.  

/ English

Integrity workshop: new tools experienced at local level in Benin

During the first quarter of 2013, CWP-Benin was busy with the final work (technical and financial reports, project final report; capitalization report) of the Multiannual program to support Water and sanitation sector (PPEA) phase I implemented by CWP-Benin which was completed in December 2012. Similarly, the CWP has also participated actively in the formulation and the launching of phase 2 of the program which will run over three years from 2013 to 2015.

/ IWRM tools / English

Water Supply and Sanitation Services (B2)

Institutions responsible for delivering such services can be public, private, or cooperatively owned and manged entities but can also result from collaborations between these sectors. Service providers are responsible for establishing, maintaining, and upgrading the water supply system, which typically involves for: collection, treatment, distribution, quality control, sewage, and reuse of water. IWRM principles stipulate that water should be provided in adequate, quality, and affordable supplies. An integrated strategy also presupposes that water services should be tailored according to the social, economic, and environmental contexts.
/ English

Water: the Connecting Link to Climate Change Adaptation

“An integrated approach to managing and developing the world’s water resources is vital for not only driving world economies, ensuring human well-being and security from hunger, but can also serve as an essential building block for enhancing coherence on adaptation,” said Dr. Ursula Schaefer-Preuss, Chair of GWP at a side event at the Bonn climate change negotiations. “Water is the connecting link because climate impacts are largely felt through the medium of water,” she said.