Search

Sort by: Relevance | Date
/ Case studies / English

Uganda: Output-based contracts in small towns water supply: challenges and opportunities (#409)

In Uganda, the National Water and Sewerage Corporation (NWSC) provide most drinking water, however, this is predominantly in urban areas. Attempting to improve water provision in rural areas, a programme supported by the World Bank was initiated. The main action taken was to commercialising service delivery through public-private partnerships. Despite being viewed as a great success, this case study highlights that circumstances can change and thus be different from those anticipated during the bidding stage.  

/ Case studies / English

Pakistan: Indus Basin Floods; Mechanisms, Impacts, and Management (#445)

The Indus River is a major transboundary river in Asia with nine tributaries. The River is about 2,800km long, with 2,682 km in Pakistan. The Indus drainage basin covers an area of about 1,140,000 km2 stretching from Afghanistan through China, India, and Pakistan. Monsoonal rains are the most important flood-causing factor in the Indus basin, followed by the size, shape, and land-use of the catchments as well as the conveyance capacity of the corresponding streams. The monsoon rains fall from June to September, and are generally intense and widespread.

/ English

NAP Workshop in Malawi

A three-day National Adaptation Plan (NAP) training workshop was held from the 3rd to 5th of September in Salima, Malawi as an effort to help the Government of Malawi identify the next steps in establishing a NAP process. The workshop was highly interactive drawing upon a broad range of climate sensitive sectors and stakeholders, and was successful in reaching its overall objectives of building an understanding of the NAP process and to draft a roadmap for country level advancement.

/ Case studies / English

Kazakhstan: Analysis of Legal Reform for the Management and Use of Water Resources (#433)

Water management in Kazakhstan was previously characterised by a command and control approach. The Water Code was adopted in 2003 as an answer to these problems. Furthermore, a project was launched to evaluate the current state of the legal framework for IWRM and to identify the potential for improvements and propose amendments to the Water Code. It is evident that IWRM is a complex approach and any amendments need to be done holistically. 

/ Case studies / English

Cameroon: Challenges in Kumbo community to improve water supply management (#364)

The Kumbo water supply system has always had contested ownership claims. After decades of protest, action was taken and management was transferred to Kumbo Urban Council, resulting in the establishment of an inclusive and participatory community water governance structure. From this, the lesson can be learnt that the command and control paradigm can provoke social and political instability. The case also demonstrates how community based platforms can enhance community mobilisation and participatory governance.