The most pressing problem facing the Songkhla Lake Basin is land degradation and water pollution caused by land use changes and shrimp farming expansion. Action was taken to combat these issues and an Integrated Environmental Management approach was applied. The key lesson of this case is that replacing blueprint master planning approaches with process oriented planning frameworks increased sustainability significantly.
The Yangtze River Basin has been severely affected by climate change. To address this, the Yangtze River Basin Climate Change Vulnerability and Adaptation Report has been drafted to evaluate the impact on representative ecosystems and water resources, and pinpoint adaptation strategies. The experience has demonstrated that good adaptation measures should consider not only climate itself, but also other factors, such as economy, technology, as well as social and cultural norms.
Nine Nile Basin Countries last February 2013 produced evidence-based climate change resilience status reports that will inform the formulation and implementation of each country’s climate change programs, strategies and policies at national, sectoral and local levels.
Unclear ownership and no formal mechanism to manage the water source of the Mvutjini earth dam have caused unfavourable conditions for the local community. Action was taken to implement IWRM by the Swaziland Country Water Partnership, aiming to revitalise the dam and set up management rules by involving local stakeholders. This case study illustrates that collaboration and partnership between institutions involved in water resources management is vital for success.
The partners of the water sector in West Africa agreed to establish among themselves, the GlobalWater Partnership of West Africa, in English "GWP / West Africa" and whose official abbreviation is "GWP / WA", and GWP West Africa, "GWP AO" in French. GWP-WA is the regional branch of the Global Water Partnership (GWP)
The WACDEP Reference Group (RG) provides demand driven technical oversight and support to the implementation of the WACDEP. The WACDEP engages the following RG members:
Cameroon actively works with a project to implement IWRM at national level. Action has been taken in a four stage process including the preparation of a national IWRM Action Plan. As a result of these measures, the foundation for IWRM Strategy and Action Plan has been laid and the strategic options identified. The key lesson learnt is that it is crucial to present key facts and results in a concise manner for effective participation in the future.
Interview with Camille F. Jepang Sandjong, in charge of IUCN Regional Programme on Wetlands and Water, West and Central Africa Programme (PACO).