The Silk Road began in ancient China and connected with Asia, Africa and Europe. It has developed from a land-based commercial route to a communication link between East and West in economic, political and cultural aspects. The “Belt and Road” aims to borrow the historical symbols of the ancient Silk Road. Contemporary Silk Road pays attention to sharing and win-win and realises the diversified, independent, balanced and sustainable development of countries along the route through the interconnection of Asian, American and European continents and nearby oceans.
During the month of May, ten workshops were held in the different regions of Honduras to raise awareness on the steps taken by the government to prepare for the implementation of SDG 6 in the country, as well as to promote that the Goal is included in local and territorial planning. They were also an opportunity to share information on GWP's campaign #ActOnSDG6.
The Capital city of Togo, Lomé hosted the kick-off meeting of the establishment process of the ECOWAS regional water observatory and validation of the provisional report of the operationalization study of the West African Regional Water Resources Policy (WARP) Monitoring and Evaluation Facility from 20 to 22 June 2018.
GWP Nigeria held a meeting between the Country Nexus team and the ECOWAS Department for Agriculture, Water and Environment on the 11/9/2017 with the WEFE regional coordinator, Dr. Fabien Hountondji in attendance. The meeting was attended with Dr. Johnson Boanuh - Director, Environment representing the Commissioner who was unavailable.
The CWP chair, Mamadou Alpha HANN led the Executive Secretariat to meet with the President of Commission No 3 of the Economic and Social Council (ESC), Mr Maurice DOPAVOGUI, accompanied by Mrs Guilao Joséphine LENO, former Minister and member of the ESC, to discuss the possibilities of collaboration with his institution.
Two pilot actions are being implemented in Niger, the first in Kankantouti (Torodi) and the second one in both Gardiberi and Koygolo (Dosso).
In Kankantouti, a site of one hectare fenced by means of wire mesh, where PROGIS made it possible to produce two market garden wells, put 401 linear meters (ml) of wire fence, 200 ml of The Californian irrigation network, dig 7 distribution basins and develop a nursery for the biological protection of the site.
As part of Stage 1 of the SDG IWRM Support Programme (SDG 6-SP), the initiative has already advanced the SDG reporting process in more than 30 countries. Together with UN Environment-DHI, the custodian agency of SDG 6.5.1, GWP has convened 34 workshops to collect the official country data for 6.5.1. (Integrated Water Resources Management, IWRM).
As part of Stage 1 of the SDG IWRM Support Programme (SDG 6-SP), the initiative has already advanced the SDG reporting process in more than 30 countries. Together with UN Environment-DHI, the custodian agency of SDG 6.5.1, GWP has convened 34 workshops to collect the official country data for 6.5.1. (Integrated Water Resources Management, IWRM).
As part of Stage 1 of the SDG IWRM Support Programme (SDG 6-SP), the initiative has already advanced the SDG reporting process in more than 30 countries. Together with UN Environment-DHI, the custodian agency of SDG 6.5.1, GWP has convened 34 workshops to collect the official country data for 6.5.1. (Integrated Water Resources Management, IWRM).