Search

Sort by: Relevance | Date
/ English

An Inter-regional Joint Proposal Development for Lancang-Mekong River Basin

Dali, 20 December 2018 -- Taking place back to back with the Workshop on Flood Control and Drought Relief Technology of Lancang-Mekong Water Resources Cooperation that was held between 17-20 December, the 2 days workshop provided the participants with a basic skills on carried out a shared vision planning to support the development of joint proposal development for Lancang-Mekong River Basin. Keywords: #sharedVisionPlanning, #TransboundaryRiverBasin, #Lancang-Mekong
/ English

Living and fighting Covid-19

The Regional Secretariat of GWP-WA based in Ouagadougou, Burkina Faso has been following closely the evolution of the coronavirus in the countries of the region.
/ English

Call for youth-led project proposals for communicating water in Malta

The regional organization Global Water Partnership – Mediterranean (GWP-Med | www.gwpmed.org) and the Energy and Water Agency of Malta (EWA| www.energywateragency.gov.mt) are issuing a call for proposals for college and university students and newly graduates of Art & Design, Media & Communication, Social Sciences and History backgrounds.
/ English

AIP WACDEP-G launches in Cameroon to Promote a Gender-transformative approach to Water Security through Climate Resilient Water Investment

With the objective to transform gender inequalities, at scale by promoting gender-transformative planning, decision-making and institutional development for climate resilient water investments in Africa, the Cameroon Country Water Partnership (GWP-Cmr) in collaboration with the Ministry of Water Resources and Energy (MINEE) held a multi-sectoral workshop in Yaoundé on February 24th 2021, to officially launch the Africa Water Investment Program, Water, Climate, Development-Gender (AIP-WACDEP G) in Cameroon.
/ English

HOW TO CONTRIBUTE

The Programme is unique, flexible and demand driven, operating without a steering committee, and unlike a typical programme with a fixed results framework, hard-wired deliverables and so on.
/ English

HOW TO CONTRIBUTE

The Programme is unique, flexible and demand driven, operating without a steering committee, and unlike a typical programme with a fixed results framework, hard-wired deliverables and so on.