After a year of operation to the satisfaction of the solar installations, and in accordance with the contract, a general review of equipment installed was made, followed by a final acceptance on December 23, 2015 by the Executive Secretary.
The transboundary Buna / Bojana Watershed is shared by Albania and Montenegro, as well as a long stretch of coastal zone of the Adriatic Sea. The watershed is faced with a variety of pressures, including unsustainable agricultural methods, increased tourism, and altered hydrological regimes from hydropower generation and flood control measures. Albania and Montenegro, while similar socially and economically, differ in their administrative, legal, and institutional frameworks. Regardless, both countries have recognized the need to strengthen their cross-border cooperation through the development of an integrated water resource plan (the Plan) for the watershed.
The international Institute for Water Engineering and Environment (2IE) in collaboration with DHI organized a training session on Integrated Water Resources Management and Environment. The training took place from 9 to 20 February 2015 in Ouagadougou for participants from Mali, Niger and Burkina Faso. As it has become an habit GWP West Africa was asked to make a communication on its activities and knowledge products to the participants.
The IDMP Waf team is preparing the capacity building workshop to be held in Ouagadougou from 4 to 8 Avril 2016 in Burkina Faso. This planned training of trainers (ToT) has been possible with the collaboration of CAPNET and aims at contrinuting to reduce the negative impacts of drought through some approaches like IWRM and effective planning. It will increase participants knowledge on these topics and come out with a monitoring tool. About twenty participants will take part drawn from administration, NGOs, Civil Society and private sector institutions of Burkina Faso, Mali and Niger, the three pilot targeted countries of IDMP and some regional institutions in West Africa.
For more on IDMP WAF: felicite.vodounhessi@gwpao.org
The CWP Guinea was visited by a team of consultant working on the evolutions in the Senegal basin transboundary environemental diagnosis analysis developed in 2006 and the need for revising it. The discussions included also how the CWP could play a more active role in the second phase of the IWRM programme (PGIRE) of OMVS, the present state of the Senegal basin, present trends of hydrological data in the basin, the environmental degradation and the Gender mainstreaming.