Solar energy installations definitely fixed for GWP / WA.

After a year of operation to the satisfaction of the solar installations, and in accordance with the contract, a general review of equipment installed was made, followed by a final acceptance on December 23, 2015 by the Executive Secretary.

Pending an assessment on the financial gains (for depreciation) it is noted that the fans, lamps and electrical outlets are exclusively supported by solar energy. This gives greater independence vis à-vis the national electric company. The staff is in a position to work with less inconvenience during hot periods of the year where there are lots of power interruptions. Furthermore it is a pride to have clean energy for carrying out GWP-WAf activities.