The Regional Coordinator, Mr. Dam MOGBANTE and Network Officer, mr. Manuel FULCHIRON made a mission in Accra, Ghana where they met with the regional office for Africa of the UN Food and Agriculture organization (FAO). The meeting aimed at informing and trying to secure partnership for the nexus « food security, water, food and ecosystem ». GWP shared its experience in particular on the country dialogs undertaken in 2015 in the context of the UN CFS work stream on water and food security as well as the envisaged follow up on water and food security in Africa.
Within the framework of developing a full project proposal on the establishment of an Early Warning System in the Lake Chad Basin area, GWP-CAf and LCBC organized a workshop on the approval of the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants, charged to produce a full-fledged project document. The workshop was held from 11-12 of July 2016 in Ndjamena, Chad.
The attendees to this meeting were 8 experts (in hydrology, climate change) and 4 support staff from the LCBC executive secretariat, 3 experts from German Cooperation groundwater and climate change adaptation projects, the coordinator of the programme to rehabilitate and strengthen the resilience of lake chad basin systems (PRESIBALT), 2 representatives of GWP Central Africa, and the team of three recruited consultants (2 experts of PEGASYS from South Africa and 1 independent consultant from Chad).
The main objective of this meeting was to present, enrich and approve the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants. It was also an opportunity for consultants to meet, share their experiences and strengthen their collaboration.
A team of GWP-WA and CWP Burkina PNE had on June 11, 2015 a visit to assess the level of implementation of work on the site of the WACDEP demonstration project in Burkina Faso. This project involves the drip irrigation techniques for the efficient management of agricultural water for the benefit of vulnerable populations in the municipality of Loumbila in the center of the country.
Since the last visit in April 2015 there has been plowing work, the installation of some drip irrigation and water pumping equipment with solar energy, among others.
GWP Central America has published a tool for municipalities with guidelines to integrate the IWRM approach to risk management in the municipal development plans.