Pr. Abel AFOUDA visited the secretariat from 21 to 26 March 2016. He discussed with the personnel all issues from traditional running ones to project technical and planning issues.
The Graeme Hall Swamp is linked to the St. Lawrence Lagoon and is the last remaining coastal wetland in Barbados. The wetland has been designated as a Natural Heritage Conservation Area and has also been established as one of two Caribbean Coastal Marine Productivity Programme (CARICOMP) monitoring sites in Barbados. The Graeme Hall Watershed, located in the south of Barbados, spans 1,156 acres. The most significant element of this watershed is the Graeme Hall Swamp.
Within the framework of developing a full project proposal on the establishment of an Early Warning System in the Lake Chad Basin area, GWP-CAf and LCBC organized a workshop on the approval of the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants, charged to produce a full-fledged project document. The workshop was held from 11-12 of July 2016 in Ndjamena, Chad.
The attendees to this meeting were 8 experts (in hydrology, climate change) and 4 support staff from the LCBC executive secretariat, 3 experts from German Cooperation groundwater and climate change adaptation projects, the coordinator of the programme to rehabilitate and strengthen the resilience of lake chad basin systems (PRESIBALT), 2 representatives of GWP Central Africa, and the team of three recruited consultants (2 experts of PEGASYS from South Africa and 1 independent consultant from Chad).
The main objective of this meeting was to present, enrich and approve the inception report on the strategy for conducting the assignment, and the deliverables to be produced by the team of consultants. It was also an opportunity for consultants to meet, share their experiences and strengthen their collaboration.