Search

Sort by: Relevance | Date
/ English

Mekrou Project 2 Niger looks at an integrated approach for pilot actions

The Project management team of the project organized two workshops in Falmey (Dosso) and Tillaberi from 18 to 21 October, 2022 for the elaboration of the action plan for the integrated management of water resources and other related resources of the pilot sites of the Mekrou Phase 2 Niger Project in the Mekrou sub-basin in Niger.
/ English

Alignment and Kick-off Meeting on Cambodia Drought Management Action Plan Project

On 17 May 2024, the Ministry of Water Resources and Meteorology (MOWRAM) represented by the Focal Point of the CREWS Project and GWP SEA through the GWP Cambodia organised the Alignment and Kick-off Meeting on the Cambodia Drought Management Action Plan (Component 1 of the CREWS Project) at Sunway Hotel, Phnom Penh City.
/ English

Biodiversity and Livelihoods in the Pungwe River basin under threat

The Pungwe River Basin originates in the eastern highlands of Zimbabwe and flows through Mozambique into the Indian Ocean. About 5 % of the basin area is in Zimbabwe, with the remainder in Mozambique. However, about 28% of basin flows are generated on the Zimbabwean side. The basin is rich in plant and animal diversity, which is constantly under threat from anthropogenic activities.
/ English

Turkmenistan is increasing its potential for adaptation to climate change

Turkmenistan is vulnerable to climate change due to the steady temperature rise and increasing water deficiency. While the changing climate is impacting the entire economy, the water sector is suffering the most acutely. The Government of Turkmenistan seeks to strengthen its adaptive and resilience capacities to climate change by integrating climate risks and adaptation measures into planning and budgeting processes via the development of a National Adaptation Planning processes (NAPs).